Loading...
HomeMy WebLinkAbout203155_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10184177 PROJECT ADDRESS: 1825 3/4 W Civic Center Dr Unit# WCC02 PLAN CHECK ENGINEER: Mazarji, ZacTEL:714 647-5831FAX:714 647-5897 TYPE OF CONSTRUCTION: N/A OCCUPANCY CLASSIFICATION(S): N/A PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 2/12/2015 T-Mobile INITIAL REVIEW 4/16/2015 EXPIRATION 8/11/2015 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Virginia Becker 3. TEL: (949)930-7458 FAX: VALUATION:$50,000.00 EMAIL: virginia.becker.contractor@crowncastle.com FLOOD ZONE:X-0602320144J APPLICABLE CODE: 2013 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit 3corrected sets of plans.(When needed) Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5831 for an appointment.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information. If applicable please remove any and all electrical sheets.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceReference calculations from B+T GRP,“Structural Analysis Report” of existing tower,Provide as built drawings to match and confirm the results of structural calculations. Provide one copy existing geotechnical report to confirm values as shown in calculations.Provide as built structural drawings, (Foundation size, rebar, pole size attachment, etc.) and attach a coy to each set of drawings. As built drawings to be labeled as. “For reference only”. As built drawings to be reviewed by engineer to confirm the results of structural calculations by B+T GRP.