Loading...
HomeMy WebLinkAbout201000_3_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10183544 PROJECT ADDRESS: 2001 S Kilson Dr PLAN CHECK ENGINEER: Ahangian, KathyTEL:714 647-5812FAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): R-3, U PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 12/30/2014 INITIAL REVIEW 1/10/2015 EXPIRATION 6/28/2015 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Lourdes Botello Salas 3. TEL: (714)760-8263 FAX: VALUATION: $64,746.00 EMAIL: FLOOD ZONE: X-0602320276J Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2013 California Residential Code (CRC); 2013 California Building Code (CBC); CMC = 2013 California Mechanical Code; CPC = 2013 California Plumbing Code; CEC = 2013 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5812 for an appointment. Please see corrections on submitted plans. Red marked set must be returned with revised plans. Plans resubmitted without the red markup set may result in delayed review time and additional plancheck fees.All persons preparing plans for others shall sign those plans. Business and Professions Code Chapter 3, Division 3, Section 5536.1 (a). This review does not include mechanical, plumbing or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following, prior to building permit issuance: -Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. -Public Works Agency approval (647-5039). - Proof of Worker's Compensation Insurance shall be required at the time of permit issuance. - School District Compliance Certificate; and a copy of the building permit application, signed by the plan check engineer, shall be required by the School District to verify the scope of the work.Show 30-inch clear width for water closet compartments and 24-inch clearance in front of a water closet. Show location of heating equipment on the plans. (CRC R303.8)Shower compartments and walls above bathtubs with shower heads installed shall be finished with a smooth, nonabsorbent surface to a height of not less than 72” above the floor. (CRC R307.2)Access shall be provided to all under-floor spaces. The floor access shall be a minimum 18” by 24” and openings through a perimeter wall shall be not less than 16” by 24”. (CRC R408.4) Show location of underfloor access crawl hole (18 x 24 inches). (CRC R408.4) (For existing house) The City has encountered a large number of inspection problems arising from a lack of specific framing details. The following listed items are required to be shown on the plans (CBC 107.1): - All plumbing walls are to be framed with a minimum of 6" studs. - Header and trimmer details for doors and windows are to be shown with full length trimmers, specifying the size of the header and trimmer. (2308.10.4.3) Provide details for retrofit shear and tension anchor bolts on plans. Provide calculations as neededShow how the dryer will be vented to the outside air. (CMC 504.3) The maximum length of a dryer vent is 14 feet with two bends. Two feet shall be decreased for each bend more than two, unless approved by the Building Official. (CMC 504.3.2.2) Show u-factor and SHGC for the windows on the window schedule.Show existing hip could carry additional load from new rafters, or provide additional support.Provide one hour fire rating on the garage side exterior wall with no opening, when garage is less than 3 feet from the property line.4x10 is overstressed, on 14 feet span provide 4x12 and on 18 feet span provide either 4x14 or 6x12. Please fillout attached SB407 form and copy it on the submitted drawings.