Loading...
HomeMy WebLinkAbout204736_1_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10184740 PROJECT ADDRESS: 300 E Chestnut Ave Unit# C PLAN CHECK ENGINEER: Heidari, FredTEL:714 647-5862FAX:714 647-5897 TYPE OF CONSTRUCTION: V A OCCUPANCY CLASSIFICATION(S): R-2, S-2 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 4/13/2015 INITIAL REVIEW 6/17/2015 EXPIRATION 10/10/2015 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Alfredo Mendoza 3. TEL: (714)591-3654 FAX: VALUATION:$12,000.00 EMAIL: alfredo@vitalbhs.com FLOOD ZONE:X-0602320276JAll items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5862 for an appointment. This review does not include plumbing or electrical work. Separate plans, applications, fees, plan checks, and permits are required for plumbing, and electrical work. Call 647-5800 for information.] The applicant shall obtain clearances/approvals for the following, prior to building permit issuance: -Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. -Proof of Worker's Compensation Insurance shall be required at the time of permit issuance. Specify approved weatherproof walking surface material at decks and balconies. Show the location(s) of hard-wired smoke alarm(s) with a battery back up in each sleeping room and at a point centrally located in the area giving access to each sleeping area. Show location of carbon monoxide alarm for each unit.Plans shall call out opening space between vertical members of the guard railto 4 inch or less. The project data on the cover sheet, A-1 shall be updated to: occupancy group of “R-2/S-2” and the construction type of: “VA”.Detail 2 on sheet S-2 does not provide a positive attachment requirement of Section 1604.8.3 of CBC. Upgrade this detail or provide attachment of the framing to the side walls.