Loading...
HomeMy WebLinkAbout205451_1_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10184997 PROJECT ADDRESS: 1840 S Bamdal St PLAN CHECK ENGINEER: So, AnsonTEL:714 647-5830FAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): R-3, U PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 5/6/2015 INITIAL REVIEW 7/1/2015 EXPIRATION 11/2/2015 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Stephen Garcia 3. TEL: (562)665-8712 FAX: VALUATION:$53,737.00 EMAIL: FLOOD ZONE:X-0602320257J APPLICABLE CODE: 2013 CALIFORNIA RESIDENTIAL CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5830 for an appointment.Please return marked up set of drawings with corrections.Sheet A1: Provide energy documentation on the plan.Sheet A2: Provide shear transfer detail at interior wall on the roof plan.Sheet A2: Roof plan shows roof trusses and conventional roof framing. Verify discrepancy. Provide roof truss shop drawings if truss design is chosen. In addition, revise roof truss details as necessary.Sheet A2: Identify braced wall on the plan. Specify braced wall length, type, location, and anchorage details on the plan.Sheet A2: Provide and cross reference dowel details between existing concrete slab and new concrete slab.Sheet A3: Specify minimum 50 cfm capability on exhaust fan in the bathroom.Sheet A3: Provide carbon monoxide device outside the proposed bedroom.Sheet A3: Specify minimum clearance dimension at water closet. See Code section below: 2010 CPC Section 407.5 Setting. Fixtures shall be set level and in proper alignment with reference to adjacent walls. No water closet or bidet shall be set closer than fifteen (15) inches from its center to any side wall or obstruction nor closer than thirty (30) inches center to center to any similar fixture. The clear space in front of any water closet or bidet shall be not less than twelve-four (24) inches. No urinal shall be set closer than twelve (12) inches from its center to any wall or partition nor closer than twenty-four (24) inches center to center. Exception: The installation of paper dispensers or accessibility grab bars shall not be considered obstructions.