Loading...
HomeMy WebLinkAbout205372_2_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10184964 PROJECT ADDRESS: 1631 W Sunflower Ave Unit# C-40 PLAN CHECK ENGINEER: Mazarji, ZacTEL:714 647-5831FAX:714 647-5897 TYPE OF CONSTRUCTION: N/A OCCUPANCY CLASSIFICATION(S): N/A PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 5/4/2015 INITIAL REVIEW 5/7/2015 EXPIRATION 10/31/2015 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Kenneth VanDissel 3. TEL: (714)435-2040 FAX: VALUATION:$10,000.00 EMAIL: vandisselk@southcoastplaza.com FLOOD ZONE:X-0602320259J APPLICABLE CODE: 2013 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Resubmit 3 corrected sets of plans.(When needed) Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. (FYI) This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuance Indicate weight of new equipment (1600#) on the drawings.Provide dimensions for roof framing detail (Detail 8, Sheet S-1) to match structural calculations and to be verified by City inspector.Reference sheet S-1, Detail 13; provide complete equipment platform to distribute the equipment load to existing roof framing members and show positive connection from equipment to platform and existing roof. Note on the drawings that all roof penetration must be ICC approved sealant.