PLAN CHECK NO:
10184726
PROJECT ADDRESS:
928 N Baker St
PLAN CHECK ENGINEER:
Ahangian, KathyTEL:714
647-5812FAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
R-3, U
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
4/9/2015
INITIAL REVIEW
4/21/2015
EXPIRATION
10/6/2015
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Tom Conneen
3.
TEL:
(909)702-5860
FAX:
VALUATION: $23,925.00
EMAIL:
anne@anneo.org
FLOOD ZONE: X-0602320144J
Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2013 California Residential Code (CRC); 2013 California Building Code (CBC); CMC = 2013 California Mechanical Code; CPC = 2013 California Plumbing Code; CEC = 2013 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5812 for an appointment.
Please see corrections on submitted plans. Red marked set must be returned with revised plans. Plans resubmitted without the red markup set may result in delayed review time and additional plancheck fees.
This review does not include mechanical, plumbing or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, and electrical work. Call 647-5800 for information.
The applicant shall obtain clearances/approvals for the following, prior to building permit issuance:
-Planning Division approval on the corrected/final set of drawings (647-5804). Previously
approved plans should be submitted to expedite the process.
-Public Works Agency approval (647-5039).
- Proof of Worker's Compensation Insurance shall be required at the time of permit issuance.
- School District Compliance Certificate; and a copy of the building permit application, signed by
the plan check engineer, shall be required by the School District to verify the scope of the work.
Delete notes and details that do not apply to this project.
Drawings submitted are so confusing, please clearly show scope of work under this permit application. Provide existing floor plan, show all existing walls and new walls.
Please revise all the framing plan, roof plan, foundation planto show existing condition and specify new work and new framing members.
Provide foundation for the stairway.Basements, habitable attics, and every sleeping room in dwelling units must have a window or exterior door for an emergency exit, sill height not more than 44 inches above the floor, 5.7 square feet of openable area, 24 inches clear opening height, 20 inches clear opening width and shall open directly into a public street, alley, yard, or exit court. Windows ______ do not comply. (CRC R310.1-R310.1.3)
CAUTION: Using minimum clear openable height with the clear openable width will yield only 3.3 square feet and not the minimum 5.7 square feet required. Be especially careful with double-hung windows. Also, when the emergency escape window is below ground level refer to CRC Section R310.2 for additional requirements. Show location of heating equipment on the plans. (CRC R303.8)Indicate detail and section references as to their appropriate location on plan views. (106.3 and 107)All new construction, interior or exterior alterations, repairs, or additions requiring a permit and having a valuation in excess of $1,000, or when one or more sleeping rooms are added or created, the entire dwelling shall be provided with smoke detectors located as required for a new dwelling. (CRC R314.3) Smoke alarms shall be installed in the following locations:
- In each sleeping room.
- Outside each separate sleeping area in the immediate vicinity of the bedrooms.
- On each additional story of the dwelling, including basements and habitable attics but not
including crawl spaces and uninhabitable attics. In dwellings or dwelling units with split
levels and without an intervening door between the adjacent levels, a smoke alarm
installed on the upper level shall suffice for the adjacent lower level provided that the lower
level is less than one full story below the upper level.
- When more than one smoke alarm is required to be installed within an individual dwelling
unit the alarm devices shall be interconnected in such a manner that the actuation of one
alarm will activate all of the alarms in the individual unit.All new construction, Interior or exterior alterations, repairs, or additions requiring a permit and having a valuation in excess of $1,000,, an approved carbon monoxide alarm shall be installed in dwelling units and in sleeping units within which fuel-burning appliances are installed and in dwelling units that have attached garages shall be provided with carbon monoxide alarms (CRC R315)
- Carbon monoxide alarms shall only be required in the specific dwelling unit or sleeping unit for
which the permit was obtained. Carbon monoxide alarms required by Sections R315.1 and
R315.2 shall be installed in the following locations: ________.
- Outside of each separate dwelling unit sleeping area in the immediate vicinity of the bedroom(s).
- On every level of a dwelling unit including basements.
- Where more than one carbon monoxide alarm is required to be installed within the dwelling unit or
within a sleeping unit the alarm shall be interconnected in a manner that activation of one alarm
shall activate all of the alarms in the individual unit.
Exception:
Interconnection is not required in existing dwelling units where repairs do not result in the removal of wall and ceiling finishes, there is no access by means of attic, basement or crawl space, and no previous method for interconnection existed.Provide detail of spiral stairways that show compliance with CRC R311.7.9.1.
- Minimum clear width at and below the handrail is 26”.
- Have a minimum tread depth of 7 1/2” at 12” from the narrow edge.
- All treads are identical with a maximum rise of 9 1/2”.
- Minimum headroom of 6’-6” shall be provided. Submit engineering calculations for stairways to show support laterally and vertically.Stairway shall positively attach to the main structure.Handrails are required on at least one side of a continuous run of treads or flight with four or more risers. (CRC R311.7.7) The top of handrails shall be placed not less than 34 inches nor more than 38 inches above the nosing of the treads. A clear space of 1-1/2 inches is required between the handrail and the wall.Where guards are used as handrails at the sides of stairs they shall have a height between 34-38 inches. (CRC R312.2.7) Provide a 42 inch high guardrail at balconies, landings and decks located more than 30” vertically to the floor or grade below. (CRC R312.1 & R312.2) Provide detail of the guard showing that a 4” diameter sphere may not pass through any opening in the guard. (CRC R312.3)For plywood floor diaphragm specify thickness, grade, T&G edges, panel span rating, nailing schedule and panel layout pattern. (CBC 2305, T2305.2.3, 2306.3, T2306.3.1, and T2306.3.2)Provide continuous Second Floor plywood diaphragm to exterior shear walls of First Floor, when Second Floor exterior shear walls are recessed.
The City has encountered a large number of inspection problems arising from a lack of specific framing details. The following listed items are required to be shown on the plans (CBC 107.1):
- All plumbing walls are to be framed with a minimum of 6" studs.
Show location of attic walls.
Please fill out attached SB407 form, and copy it on the drawings.