Loading...
HomeMy WebLinkAbout204599_2_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10184692 PROJECT ADDRESS: 2230 W Edinger Ave PLAN CHECK ENGINEER: So, AnsonTEL:714 647-5830FAX:714 647-5897 TYPE OF CONSTRUCTION: N/A OCCUPANCY CLASSIFICATION(S): N/A PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 4/16/2015 INITIAL REVIEW 6/22/2015 EXPIRATION 10/13/2015 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Hugo Ibarra 3. TEL: (562)417-5477 FAX: VALUATION:$10,000.00 EMAIL: FLOOD ZONE:X-0602320257J APPLICABLE CODE: 2013 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5830 for an appointment.Please return marked up set of drawings with corrections.Sheet C-1: Include sheet “Site Plan”, “S-1”, “10-A”, and “10-B” under sheet index.Sheet C-1: Include “Roof screen installation” under Scope of Work.Sheet C-1: Provide the following note:” This project shall comply with 2013 California Building Code”.Sheet S-1: Specify fastener connection and spacing between screen and wood framing.Sheet S-1: Specify all structural connections at roof screen structure.Sheet S-1: Structural calculations indicate 4-1/4” diameter x 6” long lag screw at each base. Specify details on the plan.Sheet S-1: Specify top and bottom of bracing details on the plan.