PLAN CHECK NO:
10184692
PROJECT ADDRESS:
2230 W Edinger Ave
PLAN CHECK ENGINEER:
So, AnsonTEL:714
647-5830FAX:714
647-5897
TYPE OF CONSTRUCTION:
N/A
OCCUPANCY CLASSIFICATION(S):
N/A
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
4/16/2015
INITIAL REVIEW
6/22/2015
EXPIRATION
10/13/2015
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Hugo Ibarra
3.
TEL:
(562)417-5477
FAX:
VALUATION:$10,000.00
EMAIL:
FLOOD ZONE:X-0602320257J
APPLICABLE CODE: 2013 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5830 for an appointment.Please return marked up set of drawings with corrections.Sheet C-1: Include sheet “Site Plan”, “S-1”, “10-A”, and “10-B” under sheet index.Sheet C-1: Include “Roof screen installation” under Scope of Work.Sheet C-1: Provide the following note:” This project shall comply with 2013 California Building Code”.Sheet S-1: Specify fastener connection and spacing between screen and wood framing.Sheet S-1: Specify all structural connections at roof screen structure.Sheet S-1: Structural calculations indicate 4-1/4” diameter x 6” long lag screw at each base. Specify details on the plan.Sheet S-1: Specify top and bottom of bracing details on the plan.