Loading...
HomeMy WebLinkAbout206896_1_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10585483 PROJECT ADDRESS: 1333 W Walnut St Unit# C PLAN CHECK ENGINEER: So, AnsonTEL:714 647-5830FAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): R-2 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 7/6/2015 INITIAL REVIEW 8/7/2015 EXPIRATION 1/2/2016 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Nadir Khan 3. TEL: (949)813-5533 FAX: VALUATION: $23,000.00 EMAIL: RUBYNADIR@YAHOO.COM FLOOD ZONE: X-0602320257J Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2013 California Residential Code (CRC); 2013 California Building Code (CBC); CMC = 2013 California Mechanical Code; CPC = 2013 California Plumbing Code; CEC = 2013 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5830 for an appointment.Delete details and notes not included in this project. For example, sheet #2, and all guard-rail details per separate permit.Show new 4x12 beam location on the plan.Provide structural detail for new 4x12 beam to new post on the plan.Provide structural connection detail between new post and foundation.Use existing-wall legend at existing exterior wall. The plan shows storage area surrounded by new walls.Detail “D1” shows a J-bolt connection to the foundation. However, the existing concrete is already hardened. Provided a connection detail with post-installed anchor bolts.Revise floor plan keynotes. Guardrail notes shall be removed per separate permit.