Loading...
HomeMy WebLinkAbout207582_1_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10185733 & 10185733 PROJECT ADDRESS: 335 E Pine St PLAN CHECK ENGINEER: Mazarji, ZacTEL:714 647-5831FAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): R-3 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 7/14/2015 INITIAL REVIEW 8/10/2015 EXPIRATION 1/10/2016 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Andres Arreguin 3. TEL: (714)926-6346 FAX: VALUATION: $109,000.00 and $37,000.00 EMAIL: andres@jbaventurecapital.com FLOOD ZONE: X-0602320276J Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2013 California Residential Code (CRC); 2013 California Building Code (CBC); CMC = 2013 California Mechanical Code; CPC = 2013 California Plumbing Code; CEC = 2013 California Electrical Code; T = Table; ICC = International Code Council.Refer to red marks on the drawings and revise drawings to show compliance. Please call for appointment at permit counter once all plan check comments have been addressed and in compliance.Resubmit marked original. Resubmit 3corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5831 for an appointment. All drawings and supporting documents shall be prepared, stamped, and signed by a California licensed architect or registered professional engineer. (CRC R301.1.3, CBC 107.1 and 107.3.4.1). This review does not include mechanical, plumbing or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following, prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. - Public Works Agency approval (647-5039). - Proof of Worker's Compensation Insurance shall be required at the time of permit issuance.Note on the drawings that structural observation is required for this permit by the engineer.Please refer to attached handouts for compliance with SB407 and Green Building Code. Provide a signed copy on the drawings to insure compliance.