PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
10185811
PROJECT ADDRESS:
715 N Harbor Blvd Unit# 108
PLAN CHECK ENGINEER:
So, AnsonTEL:714
647-5830FAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
B
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
7/22/2015
INITIAL REVIEW
8/20/2015
EXPIRATION
1/18/2016
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Tam Nguyen
3.
TEL:
(714)603-6377
FAX:
VALUATION:$36,546.00
EMAIL:
tnmn8888@gmail.com
FLOOD ZONE:X-0602320143J
APPLICABLE CODE: 2013 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5830 for an appointment.Please return marked up set of drawings with corrections.Sheet 1Revise the Construction Type to “V-B” under General Notes.Specify the “Occupancy Group” under General Notes.The project shall comply with 2013 California Building Code. Revise Code Data.Provide “Scope of Work” on the title sheet.Provide a site plan and demonstrate all related disabled-access compliances. For example, disabled-parking spaces, Path of Travel, signages…etc.Sheet 2Detail 9: Show metal channel to wood connection.Detail 9: Detail shows 4’x4’ window. However, dimensional detail shows 7’ tall window.Detail 9: Keynote 9 is not found on floor plan. It appears this detail correspond to keynote 8.Detail 5: Show blocking above drywall for direct nailing.Detail 5: Specify fastener connection at sill-channel and foundation. Specify this typical connection on all details on this sheet.Detail 5: Specify the R-value on sound insulation.Detail 6: Specify gage size for metal studs.Floor plan: Provide an enlarged detail for accessible restroom. Specify all required technical dimensions on disability features. For example: grab bars, clearance on fixtures, maneuvering clearances…etc.Floor plan: Specify tempered glazing at side-lite of door #3.Floor plan: 18 inches minimum clearance required at strike edge of door #3.Floor plan: Show clear width at corridor and Doctor-room doorway.Floor plan: show ceiling heights on plan since details indicate different ceiling heights.