Loading...
HomeMy WebLinkAbout207055_1_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10585544-45 PROJECT ADDRESS: 206 E Fourteenth St PLAN CHECK ENGINEER: Mazarji, ZacTEL:714 647-5831FAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): R-2 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 6/26/2015 INITIAL REVIEW 8/3/2015 EXPIRATION 12/23/2015 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Dawn Hess 3. TEL: (562)706-0777 FAX: VALUATION: $7,000.00 EMAIL: Roofflyer@aol.com FLOOD ZONE: X-0602320163J Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2013 California Residential Code (CRC); 2013 California Building Code (CBC); CMC = 2013 California Mechanical Code; CPC = 2013 California Plumbing Code; CEC = 2013 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit 3corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5831 for an appointment. The applicant shall obtain clearances/approvals for the following, prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. - Proof of Worker's Compensation Insurance shall be required at the time of permit issuance.Remove “Deferred submittal” note from drawings and provide drawings for new stairway, handrail and guards. Complete architectural drawings are required. Please refer to additional plan check comments.Indicate distance from each stairway to property lines.Provide a complete full-height section and details of stairway showing: (CRC R311.7) - Maximum rise of 7¾ inches and minimum run (tread) of 10 inches. - Minimum width of 36 inches. - Minimum headroom of 6 feet 8 inches. - Framing (stringer, landing, etc.) size, bracing, connections, footings. - Stairways positively anchored to the primary structure without using toe nails or nails subject to withdrawal. Closed risers are required. Show compliance on the drawings.Stairways within dwelling units and exterior stairways serving a dwelling unit shall have an illumination level of not less than 1 foot-candle measured at the center of the treads and landings. (CRC R303.6)Handrails shall not project more than 4.5” on either side of the stairway and the minimum clear width of the stairway at and below the handrail height shall be 31.5” and 27” when installed on one side and both sides, respectively. (CRC R311.7.1) The top of handrails shall be placed not less than 34 inches nor more than 38 inches above the nosing of the treads. A clear space of 1-1/2 inches is required between the handrail and the wall.Provide a 42 inch high guardrail at balconies, landings and decks located more than 30” vertically to the floor or grade below. (CRC R312.1 & R312.2) Provide detail of the guard showing that a 4” diameter (3-7/8”Max. opening) sphere may not pass through any opening in the guard. (CRC R312.3)Provide structural calculations and drawings, stamped and signed by a California licensed architect or registered Civil Engineer for: Incorporate results of structural calculations into drawings prior to re-submittal. - Stairway(s). - Handrail(s)/Guard(s). - Guard(s). Post-beam connections must be detailed on the drawings ensuring against uplift and lateral displacement (2304.9.7)