Loading...
HomeMy WebLinkAbout206828_2_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10185458 PROJECT ADDRESS: 1945 E Seventeenth St Unit# 107 PLAN CHECK ENGINEER: Mazarji, ZacTEL:714 647-5831FAX:714 647-5897 TYPE OF CONSTRUCTION: II B, SPK OCCUPANCY CLASSIFICATION(S): B PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 6/17/2015 INITIAL REVIEW 7/7/2015 EXPIRATION 12/14/2015 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Andrew Molle 3. TEL: (714)860-8022 FAX: VALUATION:$1,000.00 EMAIL: a.molle@me.com FLOOD ZONE:X-0602320164J APPLICABLE CODE: 2013 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTSResubmit 2 corrected sets of plans.(When needed) Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. (FYI) This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceDrawings/detail of Transformer is incomplete and does not provide sufficient information to review code compliance. Submit structural calculations for design and justification of proposed suspended Transformer for vertical and lateral loads by a California licensed engineer or architect.Indicate weight of transformer on the drawings.Provide dimensions for suspended Transformer Cage including all attachments. Provide complete attachment detail/s of Cage and provide partial roof deck framing where Transformer is attached. Justify existing deck above is capable of supporting the new Transformer.