HomeMy WebLinkAbout208602_1_Corrections.docxRESIDENTIAL PLAN CHECK
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
10186102 & 04
PROJECT ADDRESS:
2246 S Towner St
PLAN CHECK ENGINEER:
Mazarji, ZacTEL:714
647-5831FAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
R-3
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
8/19/2015
INITIAL REVIEW
8/28/2015
EXPIRATION
2/15/2016
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Al Maciel
3.
TEL:
(714)835-1428
FAX:
VALUATION: $116,848.00
EMAIL:
aadrafting@msn.com
FLOOD ZONE: X-0602320259J
Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2013 California Residential Code (CRC); 2013 California Building Code (CBC); CMC = 2013 California Mechanical Code; CPC = 2013 California Plumbing Code; CEC = 2013 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, a separate sheet for response may be used. Resubmit 3corrected sets of plans.When meeting is needed, meetings between the project applicant/designer and the plan reviewer shall be by appointment only.
This review does not include mechanical, plumbing or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, and electrical work. Call 647-5800 for information. Please remove electrical, Mechanical and Plumbing drawings.
The applicant shall obtain clearances/approvals for the following, prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804). Previously
approved plans should be submitted to expedite the process.
- Public Works Agency approval (647-5039).
- Proof of Worker's Compensation Insurance shall be required at the time of permit issuance.
- School District Compliance Certificate; and a copy of the building permit application, signed by
the plan check engineer.Indicate new floor area of 1st and 2nd floor on the drawings for school fees.Please refer to red marks on the drawings for both architectural and structural drawings and revise drawings to show compliance.Show location and framing of new FAU on the architectural drawings. For an FAU located in the attic provide a minimum access of 22 x 30 inches, a 24-inch wide walkway, a 30-inch deep work platform, and electric light outlet adjacent to the furnace and switched by the opening. (CMC 904.11 & 305)Provide a complete full-height section and details of stairway showing: (CRC R311.7)
- Maximum rise of 7¾ inches and minimum run (tread) of 10 inches.
- Minimum width of 36 inches.
- Minimum headroom of 6 feet 8 inches.
- Enclosed usable space under a stairway requires ½ inch gypsum board on the enclosed side. (CRC
R302.7)Stairways within dwelling units and exterior stairways serving a dwelling unit shall have an illumination level of not less than 1 foot-candle measured at the center of the treads and landings. (CRC R303.6). Exterior stairways serving a dwelling unit shall have an artificial light source located in the immediate vicinity of the top landing of the stairway. (CRC R303.6)Handrails are required on at least one side of a continuous run of treads or flight with four or more risers. (CRC R311.7.7) Handrails shall be continuous except at a turn they are permitted to be interrupted by a newel post and have a minimum clear distance between the wall and handrail grip of 1 ½ inches. (CRC R311.7.7.2) The top of handrails shall be placed not less than 34 inches nor more than 38 inches above the nosing of the treads. A clear space of 1-1/2 inches is required between the handrail and the wall.Provide dimensioned details of handrail grips showing compliance with one of the following:
- Circular cross sectional diameter shall be between 1 ¼” and 2”. Non-circular handrails shall have
a perimeter dimension between 4 and 6 ¼ inches with a maximum cross section of dimension of
2 ¼ inches. (CRC R311.7.7.3 (1)) Provide a 42 inch high guardrail at balconies, landings and decks located more than 30” vertically to the floor or grade below. (CRC R312.1 & R312.2) Provide detail of the guard showing that a 4” diameter sphere may not pass through any opening in the guard. (CRC R312.3)Where guards are used as handrails, provide a detail of the guard (including a handrail on open sides of the stairway) showing that a 4 3/4” diameter sphere may not pass through the open space between intermediate rails and pickets. The open space between the riser tread and bottom rail of the guard shall not allow a 6-inch diameter sphere to pass through. (CRC R312.3).Where guards are used as handrails at the sides of stairs they shall have a height between 34-38 inches. (CRC R312.2.7Window or exterior door for an emergency exit, sill height not more than 44 inches above the floor, 5.7 square feet of openable area, 24 inches clear opening height, 20 inches clear opening width (CRC R310.1-R310.1.3)
CAUTION: Using minimum clear openable height with the clear openable width will yield only 3.3 square feet and not the minimum 5.7 square feet required. Be especially careful with double-hung windows. Also, when the emergency escape window is below ground level refer to CRC Section R310.2 for additional requirements.
Please refer to attached California Green Building Standards Code (CGBS)/CALGreen forms and SB 407. Provide complete forms on the drawings.
Submit T-24 energy calculation based on 2013 Energy Standards and provide State approval on the
drawings. Provide T-24 sheets on the drawings.
The City has encountered a large number of inspection problems arising from a lack of specific framing details. The following listed items are required to be shown on the plans (CBC 107.1):
- All plumbing walls are to be framed with a minimum of 6" studs.
- Double walls used as plumbing walls are to be a minimum of 8" wide and no "flat" studs permitted.
Staggered studs are acceptable.
- Permissible notching and boring of joists are to be shown on the plans and shall not exceed CBC
Section 2308.10.4.2 allowances.
- Notching of exterior and bearing/nonbearing walls shall not exceed 25%/40% respectively. Bored
holes in bearing/nonbearing walls shall not exceed 40%/60% respectively. In no case shall the
edge of the bored hole be nearer than 5/8 inch to the edge of the stud. (2308.9.10 and 2308.9.11)
Revise structural calculation and drawings. In lieu of soils investigation report per City of Santa Ana internal policy:
- Allowable foundation pressure not to exceed 1000 PSF.
- Footing to have minimum reinforcement of: 2 #4 at top and 2 #4 at bottom.
Provide drag connection detail/s for 2nd floor and roof framing plan as marked at line B and D on Sheet S-3 of structural drawings.
Reference Sheet S-5, details, 24, 26 and 27 clarify if Truss manufacture to submit detail/s for Shear transfer. Specify minimum nailing and blocking size on the drawings.
Reference detail #31 on Sheet S-5; provide Shear transfer detail by conscious plywood to exterior Shear walls.
Reference Sheet S-3, line D,Beam #7, please clarify location of missing isolated footing and span for beam #7.Note on drawings: "Truss supplier shall submit calculations and shop drawings signed by a registered civil engineer to the responsible project designer who agrees to review the shop drawings for acceptance prior to fabrication. Shop drawings and calculations shall be submitted to the Building Safety Division for acceptance after the responsible project designer has noted his/her acceptance and prior to fabrication.”
-Plans, structural calculations, and specifications must be prepared by a California registered civil
engineer. (A106.1)