Loading...
HomeMy WebLinkAbout209501_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10186362 PROJECT ADDRESS: 2525 W Westminster Ave Unit# D PLAN CHECK ENGINEER: So, AnsonTEL:714 647-5830FAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): M PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 8/27/2015 INITIAL REVIEW 9/17/2015 EXPIRATION 2/23/2016 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Todd Nguyen 3. TEL: (714)499-4459 FAX: VALUATION:$61,424.00 EMAIL: bttnguyen2004@yahoo.com FLOOD ZONE:X-0602320144J APPLICABLE CODE: 2013 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5830 for an appointment.Please return marked up set of drawings with corrections.Sheet A-0: Revise the Code Edition to “2013” under Plan Analysis.Sheet A-0: Revise the Occupancy Group to “M” under Plan Analysis.Sheet A-2: Specify width and length of entrance door. In addition, specify door hardware.Sheet A-2: Specify maximum 34 inches counter height at accessible counter. In addition, reference Knee-and-Toe clearance detail on sheet A4.Sheet A-2: Cross reference structural detail on new partition wall.Sheet A-2: Specify all door type on the floor plan.Sheet A-2: Specify hall width near exam room #1.Sheet A-3: Cross reference structural detail at hard-ceiling soffit.Sheet A-4: Provide bracing connection on detail 10.Sheet A-4: Specify connection details on detail 9. Provide framing connection in lieu of wire-hanging connection.