PLAN CHECK NO:
10185865
PROJECT ADDRESS:
2021 S Broadway
PLAN CHECK ENGINEER:
Ahangian, KathyTEL:714
647-5812FAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
R-3, U
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
7/27/2015
INITIAL REVIEW
8/8/2015
EXPIRATION
1/23/2016
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Joseph Phan
3.
TEL:
(714)454-0715
FAX:
VALUATION: $66,745.00
EMAIL:
FLOOD ZONE: X-0602320276J
Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2013 California Residential Code (CRC); 2013 California Building Code (CBC); CMC = 2013 California Mechanical Code; CPC = 2013 California Plumbing Code; CEC = 2013 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5812 for an appointment.
Please see corrections on submitted plans. Red marked set must be returned with revised plans. Plans resubmitted without the red markup set may result in delayed review time and additional plancheck fees.
All drawings and supporting documents shall be prepared, stamped, and signed by a California licensed architect or registered professional engineer. (CRC R301.1.3, CBC 107.1 and 107.3.4.1).
This review does not include mechanical, plumbing or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, and electrical work. Call 647-5800 for information.
The applicant shall obtain clearances/approvals for the following, prior to building permit issuance:
-Planning Division approval on the corrected/final set of drawings (647-5804). Previously
approved plans should be submitted to expedite the process.
-Public Works Agency approval (647-5039).
- Proof of Worker's Compensation Insurance shall be required at the time of permit issuance.
Provide a fully dimensioned Site Plan on the drawings and on a separate 8-1/2" x 11" sheet of paper.
Provide eave / overhang / projection setback to all property lines.
Provide dimensioned existing floor plan.Show 30-inch clear width for water closet compartments and 24-inch clearance in front of a water closet. Shower compartments and walls above bathtubs with shower heads installed shall be finished with a smooth, nonabsorbent surface to a height of not less than 72” above the floor. (CRC R307.2)Glass enclosure doors and panels must be labeled Category II. Swing door outward. Net area of shower receptor shall be not less than 1,024 sq. in. of floor area, and encompass 30-inch diameter circle. (CPC411.7)For each enclosed attic space with a maximum vertical height greater than 30 inches, provide a minimum of 22 x 30 inches attic access. (CRC R807.1) Bathroom or service room minimum window areas shall not be less than 3 square feet and 50% openable or, provide a mechanical ventilation system exhausted to the outside capable of providing 50 cubic feet per minute for intermittent ventilation 25 cubic feet per minute for continuous ventilation. (CRC R303.3) Bathrooms, laundry rooms, water closet compartments and similar rooms shall be mechanically ventilated in accordance with the CMC.Provide a complete full-height section and details of stairway showing: (CRC R311.7)
- Maximum rise of 7¾ inches and minimum run (tread) of 10 inches. For plywood floor diaphragm specify thickness, grade, T&G edges, panel span rating, nailing schedule and panel layout pattern. (CBC 2305, T2305.2.3, 2306.3, T2306.3.1, and T2306.3.2)
Note on the plans that foundation anchor bolts in walls shall have an approved plate washer under each nut; and the nuts shall be tightened just prior to covering the wall framing. Plate washers a minimum of 3 inch by 3 inch by 0.229 inch thick shall be used on each bolt. (AF&PA SDPWS 4.3.6.4.3)
The City has encountered a large number of inspection problems arising from a lack of specific framing details. The following listed items are required to be shown on the plans (CBC 107.1):
- All plumbing walls are to be framed with a minimum of 6" studs.
- Notching of exterior and bearing/nonbearing walls shall not exceed 25%/40% respectively. Bored
holes in bearing/nonbearing walls shall not exceed 40%/60% respectively. In no case shall the
edge of the bored hole be nearer than 5/8 inch to the edge of the stud. (2308.9.10 and 2308.9.11)
- Header and trimmer details for doors and windows are to be shown with full length trimmers,
specifying the size of the header and trimmer. (2308.10.4.3)
For plywood roof and floor diaphragm specify thickness, grade, T&G edges, panel span rating, nailing schedule and required blocking and panel layout pattern.For an FAU located in the attic provide a minimum access of 22 x 30 inches, a 24-inch wide walkway, a 30-inch deep work platform, and electric light outlet adjacent to the furnace and switched by the opening. (CMC 904.11 & 305) Show 22 x 30 inch clear access to the furnace. Provide a maximum of 20 feet from opening to furnace. (CMC 904) Provide 2 rows of blocking for gable roof detail (1/S1) to prevent hinges.Provide holddowns at each side of the shearwall.Call out size of the footing on the foundation plan.Provide detail for the strap from the walls to the rafters, and call out on the plan view.Provide 36” landing at the patio door in the master bedroom.Please fillout attached SB407 form and copy it on the drawings.