Loading...
HomeMy WebLinkAbout209972_2_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10186528 PROJECT ADDRESS: 308 N Eastside Ave PLAN CHECK ENGINEER: So, AnsonTEL:714 647-5830FAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): R-3, U PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 9/15/2015 INITIAL REVIEW 10/20/2015 EXPIRATION 3/13/2016 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Kaye Foroozanfar 3. TEL: (714)507-0265 FAX: VALUATION: $48,912.00 EMAIL: FLOOD ZONE: X-0602320276J Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2013 California Residential Code (CRC); 2013 California Building Code (CBC); CMC = 2013 California Mechanical Code; CPC = 2013 California Plumbing Code; CEC = 2013 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5830 for an appointment.The drawings/information submitted for Building Safety Division review is incomplete. The applicant shall, prior to resubmitting, complete all construction documents to show compliance with the 2013 California Building Standards Code with local amendments and to clearly indicate the scope of work under this building permit application. There may be additional requirements when complete construction drawings and supporting data is submitted for Building Safety Division review.Sheet A-1Provide “Scope of Work” on the first sheet.Provide Energy documentation on plan.Show electrical outlet locations on the floor plan.Identify living room and dining room as new construction and all other rooms to be existing construction on the floor plan.Sheet S-1Detail “L/S2” and “P/S2” are referenced on roof framing plan. However, detail L and P are missing on sheet S2.Provide a Header-Opening framing detail.