Loading...
HomeMy WebLinkAbout212504_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10187479 PROJECT ADDRESS: 1111 E Wakeham Ave Unit# N PLAN CHECK ENGINEER: Chehade, NabilTEL:714 667-2743FAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): B, F-2 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 12/10/2015 INITIAL REVIEW 2/2/2016 EXPIRATION 6/7/2016 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Bart Hamlett 3. TEL: (714)512-4615 FAX: VALUATION:$25,000.00 EMAIL: bart@bcwastewater.com FLOOD ZONE:X-0602320276J APPLICABLE CODE: 2010 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 667-2743 for an appointment.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Fire Department approval on the corrected/final sets of drawings ((714)573-6100) - Police Department approval on the corrected/final set of drawings (647-5840) - Public Works Agency approval (647-5039) - Grading Permit. Application is made through the Building Safety Division (647-5800) and the plan review is by the Public Works Agency (647-5039) - County of Orange Health Department approval on the corrected/final set of drawings ((714)433-6000) - School District Compliance Certificate; a copy of the building permit application, signed by the plan check engineer, shall be required by the School District to verify the scope of work. Refer to the attached handout. - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuance - Information Technology equipment rooms require a completed electrical plan check prior to issuance of the building permit to ensure compliance with the 2010 California Electrical Code (CEC) Article 645, Electronic Computer/Data Processing Equipment. CEC Article 645 may require fire-rated walls, floors, and ceilings for the computer room(s). For additional information, contact Mr. Scott Davis, Electrical Plan Check at (714) 647- 5822.The valuation of improvements for the subject building permit application has been calculated to be $25000.Show on the plans: - Complete legal description - Assessor’s Parcel Number - Project Address/Suite/Room Numbers; Building Numbers - Occupancy Classification(s) - Type of Construction - Area tabulation justifying floor area(s) of building(s) (CBC Sections 503, 505, 506, 507, and 508 and CBC Table 503) - Fire Sprinkler System (State purpose of sprinkler system, for example, area increase under CBC Section 506.3, required by CBC Section 903 for type of occupancy, etc.)Provide a floor plan that shows location of all exit doors, hallways corridoes etc. Please make sure the new installation does not interferes with the required exits.Specify on plans the type of construction of the building and occupancy group as permitted. Specify on plans the existing and proposed use and occupancy of the building.Clarify where the exhaust fan is located. Please clarify if the exhaust fan is existing or proposed; if new, please show location and its support on the structural plans.Specify the weight of the ducts and have the attachment to the roof structure evaluated by the engineer of record. ( the duct attachment details should be shown on structural plans.Specify the ESR report number for the anchors on plans. Per ESR report, special inspection is required for the installation the anchor bolts. Please indicate so on the plans.