HomeMy WebLinkAbout213612_1_Corrections.docxRESIDENTIAL PLAN CHECK
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
10187830
PROJECT ADDRESS:
110 E Occidental St
PLAN CHECK ENGINEER:
Heidari, FredTEL:714
647-5862FAX:714
647-5897
TYPE OF CONSTRUCTION:
V B, SPK
OCCUPANCY CLASSIFICATION(S):
R-3, U
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
12/30/2015
INITIAL REVIEW
1/19/2016
EXPIRATION
6/27/2016
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Javier Hernandez
3.
TEL:
(626)483-8700
FAX:
VALUATION:$360,507.00
EMAIL:
FLOOD ZONE:X-0602320276JAll items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5862 for an appointment.
All drawings and supporting documents shall be prepared, stamped, and signed by a California licensed architect or registered engineer.
The structural part of these plans needs some attention from the designer. See red marks on sheet SN1, 10, 11, 121, SD, and SD2. Also see red marks on the calculation for vertical and lateral loads justifications.
Please provide all pages of ENERCAL calculation sheet to show the reactions for each beam.
Calculation for FB-1 with 18’ span shows TW=1’ and drawing calls for 16”o/c. revise the drawing to show compliance with calc.
Please verify the reaction of FB-3 as it is carry by FB-4. See red marks on the calc. for this beam.
Seems like the span for FB-6 is 19’ per plans and the calc. shows only 18’ span. Please verify.
The calculation for each beam, please call out the location of the beam on the floor plan. I could not find the location of FB-12 on the floor plan.
For calculation the FB-18, please call out the value of the P3. See calc.
The garage header per plan is FB-19, and calculation shows this beam with the span of 9’. Please change the span to 18’ per plan.
The sizes of the following beams on the plan are different than the sizes on the calc. see floor plan for FB-5, FB-8, FB-10, and FB-9.
The lateral load calculation is not clear. The calc. shall clearly calls out between the wind loads and the seismic loads which one governs which floor and which direction. See red marks on the calc.
Please calc the shear load for the roof and floor diaphragms and justify the roof and floor sheathing accordingly.
Provide calculation for the drag loads and provide construction details to show how these drags are connected to the load resisting drag systems.
The calculated loads to each shear wall shall be based on principal of flexible diaphragms. Revise the shear walls calculations to be reflecting this.All persons preparing plans for others shall sign those plans. Business and Professions Code Chapter 3, Division 3, Section 5536.1 (a).
This review does not include mechanical, plumbing or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, and electrical work. Call 647-5800 for information.
The applicant shall obtain clearances/approvals for the following, prior to building permit issuance:
-Planning Division approval on the corrected/final set of drawings (647-5804). Previously
approved plans should be submitted to expedite the process.
- Fire Department approval on the corrected/final set of drawings (647-5839 or 647-5700).
-Police Department approval on the corrected/final set of drawings (647-5840).
-Public Works Agency approval (647-5039).
-Proof of Worker's Compensation Insurance shall be required at the time of permit issuance.
- School District Compliance Certificate; and a copy of the building permit application, signed by
the plan check engineer, shall be required by the School District to verify the scope of the work.
-In addition to other fees, a "Park Acquisition and Development Fee" in the amount shownbelow
shall be required pursuant to a resolution of the City Council for the Recreation andCommunity
Services Agency; net addition of ________ bedroom(s).
Amount of $5,233.96; net addition of 4 bedrooms
Amount of $4,726.87; net addition of 3 bedrooms
Amount of $3,523.12; net addition of 2 bedrooms
Amount of $2,644.15; net addition of 1 bedroom
Indicate detail and section references as to their appropriate location on plan views.
Specify approved weatherproof walking surface material at decks and balconies.
Provide fire blocking in concealed spaces of stud walls and partitions, including furred spaces at the ceiling and floor level and at 10 ft. intervals both vertical and horizontal.
The residence shall conform to the State Energy Conservation Standards. Submit forms and calculations for review and blueprint the final forms on the plans.
-Signed Energy Efficiency Documents must be printed on the plans.
-The permit applicant shall be responsible for obtaining an energy plan check from a consultant
who is qualified to perform an energy efficiency analysis in accordance with the California Code
of Regulations (CCR), Title 24, Part 1 (Administration) and Part 6 (2013 California Energy Code).
The plan check consultant must sign documentation certifying that a thorough, competent review
has been performed on behalf of the Enforcement Agency.
-The energy plan check consultant must sign documentation forms on behalf of the Building
Safety Division.
-Refer to the attached public handouts titled “Energy Efficiency Compliance” and “Energy
Efficiency Compliance Documentation”.
Show Radiant Barrier, Cool Roofing, Duct Ceiling as required by the 2013California Energy Residential Manual.
Regardless of the occupant load, there shall be a floor or landing on each side of a door. The floor or landing shall not be more than one and half-inch lower than the threshold of the doorway. Please show compliance for the door from the house into the garage. See red marks on the sheet 2 of drawing.
For plywood roof diaphragms, specify thickness, grade, panel span rating, and nailing schedule.
Note on the plans: "Roof diaphragm nailing to be inspected before covering. Face grain of plywood shall be perpendicular to supports."
Studs in bearing walls are limited to 10 feet in height unless an approved design is submitted. See Section 2308.9.1 of CBC.Provide continuous Second Floor plywood diaphragm to exterior shear walls of First Floor, when Second Floor exterior shear walls are recessed.
Provide a weep screed for stucco at the foundation plate line a minimum of 4 inches above the earth or 2 inches above paved areas.
Provide structural calculations and drawings prepared by a California Licensed Architect or Registered Civil Engineer for all structural work to be performed under the subject building permit application including:
Provide diaphragm chord connection details addressing both tension and compression loading.
See other red marks on the plan. please resubmit the marked up set with revised plans for recheck.