PLAN CHECK NO:
10186942
PROJECT ADDRESS:
1114 W Occidental St
PLAN CHECK ENGINEER:
Ahangian, KathyTEL:714
647-5812FAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
R-3, U
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
10/21/2015
INITIAL REVIEW
11/23/2015
EXPIRATION
4/18/2016
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Jose Flor
3.
TEL:
(714)457-9177
FAX:
VALUATION: $62,348.00
EMAIL:
FLOOD ZONE: X-0602320257J
Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2013 California Residential Code (CRC); 2013 California Building Code (CBC); CMC = 2013 California Mechanical Code; CPC = 2013 California Plumbing Code; CEC = 2013 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5812 for an appointment.The drawings/information submitted for Building Safety Division review is incomplete. The applicant shall, prior to resubmitting, complete all construction documents to show compliance with the 2013California Building Standards Code with local amendments and to clearly indicate the scope of work under this building permit application. There may be additional requirements when complete construction drawings and supporting data is submitted for Building Safety Division review.
Please see corrections on submitted plans. Red marked set must be returned with revised plans. Plans resubmitted without the red markup set may result in delayed review time and additional plancheck fees.
All drawings and supporting documents shall be prepared, stamped, and signed by a California licensed architect or registered professional engineer. (CRC R301.1.3, CBC 107.1 and 107.3.4.1).All persons preparing plans for others shall sign those plans. Business and Professions Code Chapter 3, Division 3, Section 5536.1 (a).
This review does not include mechanical, plumbing or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, and electrical work. Call 647-5800 for information.
The applicant shall obtain clearances/approvals for the following, prior to building permit issuance:
-Planning Division approval on the corrected/final set of drawings (647-5804). Previously
approved plans should be submitted to expedite the process.
-Public Works Agency approval (647-5039).
- Proof of Worker's Compensation Insurance shall be required at the time of permit issuance.
Provide building information on plans:
- Occupancy type: R3 / U
- Construction type: Type V – B Provide a statement on the title sheet of the plans that this project shall comply with following codes:
- 2013 California Residential Code (CRC)
- 2013 California Building Code (CBC)
- 2013 California Electrical Code (CEC)
- 2013 California Mechanical Code (CMC)
- 2013 California Plumbing Code (CPC)
- 2013 California Green Building Standards Code (CGBS) or CALGreen
- 2013 California Energy Code (CEnC)
- City of Santa Ana Municipal CodeBasements, habitable attics, and every sleeping room in dwelling units must have a window or exterior door for an emergency exit, sill height not more than 44 inches above the floor, 5.7 square feet of openable area, 24 inches clear opening height, 20 inches clear opening width and shall open directly into a public street, alley, yard, or exit court. Windows ______ do not comply. (CRC R310.1-R310.1.3)
CAUTION: Using minimum clear openable height with the clear openable width will yield only 3.3 square feet and not the minimum 5.7 square feet required. Be especially careful with double-hung windows. Also, when the emergency escape window is below ground level refer to CRC Section R310.2 for additional requirements. All new construction, interior or exterior alterations, repairs, or additions requiring a permit and having a valuation in excess of $1,000, or when one or more sleeping rooms are added or created, the entire dwelling shall be provided with smoke detectors located as required for a new dwelling. (CRC R314.3) Smoke alarms shall be installed in the following locations:
- In each sleeping room.
- Outside each separate sleeping area in the immediate vicinity of the bedrooms.
- On each additional story of the dwelling, including basements and habitable attics but not
including crawl spaces and uninhabitable attics. In dwellings or dwelling units with split
levels and without an intervening door between the adjacent levels, a smoke alarm
installed on the upper level shall suffice for the adjacent lower level provided that the lower
level is less than one full story below the upper level.
- When more than one smoke alarm is required to be installed within an individual dwelling
unit the alarm devices shall be interconnected in such a manner that the actuation of one
alarm will activate all of the alarms in the individual unit.Show location of heating equipment on the plans.Glazing in swinging, sliding, and bifold doors 9 square feet or less shall be a minimum category classification of I (CPSC 16 CFR 1201) and II (CPSC 16 CFR 1201) when more than 9 square feet or sliding. (Table R308.3.1 (1), R308.3 (1)) Provide cross ventilation for attic and each enclosed rafter space as specified in CRC Section R806. Callout atticvent locations, sizes and types on plans. Provide attic ventilation calculation to show minimum ventilation is provided. (CRC R806.2)The total net free ventilating area shall not be less than 1/150or 1/300 when a Class I or II vapor barrier is installed on the warm-in-winter side of the ceiling. (CRC R806.2) Show a 7' minimum ceiling height for habitable rooms, hallways, bathrooms, toilet & laundry rooms, and basements containing these spaces. (CRC R305.1) Specify a minimum 0.019” (No. 26 galvanized sheet gage) corrosion-resistant or plastic weep screed located below foundation plate line and 4 inches above grade on all exterior stud walls or 2-inches above paved areas. (CRC R703.6.2.1)
Detail the shear transfer connections which transfer lateral forces from horizontal diaphragms through intermediate elements and shear walls to the foundation. (1603)
Detail how the interior shearwalls are connected to the roof diaphragm.
The City has encountered a large number of inspection problems arising from a lack of specific framing details. The following listed items are required to be shown on the plans (CBC 107.1):
- All plumbing walls are to be framed with a minimum of 6" studs.
Provide details for retrofit shear and tension anchor bolts on plans. Provide calculations as needed
Call out anchor bolt size and spacing on foundation plan. Provide 1/2" diameter embedded 7" minimum at 6' o.c. maximum spacing (4' o.c. for 2 stories). CRC R403.1.6
Unable to find floor beams(type) on foundation plan.
Scale of the drawings doesn’t match the dimensions provided on the foundation and framing plan, please change them accordingly.
Please change shearwall length on sheet S1 and S2.
Show stairs detail and dimensions at new bedroom and living room landing.The residence shall conform to the State Energy Conservation Standards. Submit forms and calculations for review and blueprint the final forms on the plans.
- Signed Energy Efficiency Documents must be printed on the plans.
- Also, submit 2 copies of signed Energy Efficiency calculations.
- The corrected/final drawings shall have the required energy efficiency compliance documentation
with completed signature blocks filed on the plans.Submit a complete energy compliance package complying with 2013 CESC Section 150.(T24-1-10.103)Additions and alterations are required to comply with 2013 CESC Section 152. Submit an energy compliance package showing compliance with package D or a complete performance analysis. (T24-1-10.103) Revise framing plans to indicate insulation for walls R=19, ceiling R=30, and raise floor R=19 climate zone 8. (2013 CESC 150) Please fillout attached SB407 form and copy it on the drawing.