HomeMy WebLinkAbout213702_2_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10187847 PROJECT ADDRESS: 1935 E Seventeenth St Unit# D PLAN CHECK ENGINEER: Heidari, FredTEL:714 647-5862FAX:714 647-5897 TYPE OF CONSTRUCTION: V B, SPK OCCUPANCY CLASSIFICATION(S): B PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 1/5/2016 INITIAL REVIEW 1/21/2016 EXPIRATION 7/3/2016 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Liging Xu 3. TEL: (818)506-2555 FAX: VALUATION:$5,000.00 EMAIL: FLOOD ZONE:X-0602320164J APPLICABLE CODE: 2013 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5862 for an appointment.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Public Works Agency approval (647-5039) - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceProvide typical section view detail of all new partitions and ceilings showing: - Size, spacing, and material of framing members - Note gauge and ICC Research Report number and installation/construction requirements for metal framing members. - Method of attaching framing to the building structure. Compliance shall be shown with CBC chapter 16 for lateral support of the walls. Do not support top of walls to suspended ceiling system unless calculations and drawing prepared by a registered engineer are submitted for review. - Sheathing material and details of attachment. Note type, size, and spacing of fasteners. - Heights of partition, suspended ceiling, structure above.Note on drawing: “Exit doors shall be openable from the inside without the use of a key or any special knowledge or effort.”Note on the drawings: “Maximum effort to operate doors shall not exceed 5 pounds for exterior doors and interior doors, such pull or push effort being applied at right angles to hinged doors and at the center place of sliding or folding doors. Sanitary facilities serving the area of new work shall be disabled accessible.The restroom layout on the floor plan does not match the enlarge restroom plan. Revise the drawings to show compliance with CBC chapter 11BShow compliance with chapter 11B for the R. Desk/ Counter.Items remaining: All items are checked out except the following some remain just for information;Items, 1,2,3,and 4 the phone number for recheck is (714) 667-2743(Nabil Chehade),item 6,and item # 7 with clarification:Specify the spacing between the posts. The partition is spanning between the top plate and the floor. Provide a detail showing the support of the top plate to the post; provide a top plate large enough to support the load. Further, provide an ICC/ESR for the powder driven pins to be used, show the length and the gauge of the pin.