Loading...
HomeMy WebLinkAbout213278_2_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10187696 PROJECT ADDRESS: 3033 S Harbor Blvd PLAN CHECK ENGINEER: Heidari, FredTEL:714 647-5862FAX:714 647-5897 TYPE OF CONSTRUCTION: V B, SPK OCCUPANCY CLASSIFICATION(S): B PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 12/17/2015 INITIAL REVIEW 1/4/2016 EXPIRATION 6/14/2016 RECHECKS: 1. 1/28/2016 PROJECT APPLICANT CONTACT PERSON: 2. Priyanka Bansal 3. TEL: (323)337-6613 FAX: VALUATION:$26,171.00 EMAIL: FLOOD ZONE:X-0602320258J The recheck of your plans were completed this morning. Plans are approved for permit subject to item # 6 from the list below. Please pick up the plans from the plan check counter and obtain the approvals listed under item # 6 before issuance of the building permit. APPLICABLE CODE: 2013 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5862 for an appointment.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Orange County Fire Authority approval on the corrected/final sets of drawings ((714)573-6100) - Police Department approval on the corrected/final set of drawings (647-5840) - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceAll doors require a level floor landing on each side in accordance with CBC Sections 1008.1.5 and 11B-303. Provide typical door threshold details and details of change in floor covering material for the proposed door to cure box with 6” curb.The floor or landing at each side of an exit door shall be level and having a length in the direction of the door swing of at least 60” and the length opposite the direction of door swing of 44” as measured at right angles to the plane of the door in the closed position.Hand-activated door opening hardware shall be centered between 30” and 44” above the floor. Latching and locking doors that are hand activated and which are in a path of travel shall be operable with a single effort by lever-type hardware, by panic bars, push-pull activating bars, or other hardware designed to provide passage without requiring the ability to grasp the opening hardware. Show compliance for proposed door to cure box area.It is the project designer’s/property owner’s responsibility to show compliance on the drawings with all applicable Federal and State Accessibility Standards.Valuation of proposed project is calculated as $26,171. A minimum of 20% of valuation of construction is required to be spent towards providing disabled access in the priority order noted in the immediate previous item as noted in CBC Section 11B-202.3. Revise the drawings to show compliance. Provide structural calculations and drawings, stamped and signed by a California licensed architect or registered civil engineer for vertical and lateral loads of: - New mechanical equipment on roof (note on Roof Framing Plan weight of each existing and new piece of equipment on the roof) - New testing equipment as shown on sheet S101.