Loading...
HomeMy WebLinkAbout213187_2_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10187666 PROJECT ADDRESS: 2729 S Grand Ave PLAN CHECK ENGINEER: Mazarji, ZacTEL:714 647-5831FAX:714 647-5897 TYPE OF CONSTRUCTION: V B, SPK OCCUPANCY CLASSIFICATION(S): B PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 12/15/2015 INITIAL REVIEW 12/28/2015 EXPIRATION 6/12/2016 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Atef Khalil 3. TEL: (909)646-0096 FAX: VALUATION:$30,000.00 EMAIL: khalil@atefkhalil.com FLOOD ZONE:X-0602320278J APPLICABLE CODE: 2013 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. A separate sheet for response may be used.Resubmit 3 corrected sets of plans.(When meeting is needed) Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process.- Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceIndicate roof covering material for sloped roof on Detail A, Sheet S-2.Valuation of proposed project is calculated as $30,000.00. A minimum of 20% of valuation of construction is required to be spent towards providing disabled access in the priority order noted in the immediate previous item as noted in CBC Chapter 11B, Division 2 of 2013 CBC. Revise the drawings to show compliance. Show both existing elements and how they will be upgraded to current standards.Drawings submitted to the Building Division for review shall provide the following information to insure compliance with CBC /Chapter 11B, Division 2 of 2013 CBC: - An accessible entrance - An accessible route to the altered area - Accessible restrooms - Accessible telephone (if any) - Accessible drinking fountains, and - Parking, signage and alarmsProvide dimensions for detail A for height and projection of exterior wall.Please refer to attached SB 407 and provide a completed form on the drawings to insure compliance. As of January 1, 2014, SB 407 requires non-compliant plumbing fixtures to be replaced by waterconserving plumbing fixtures when a property is undergoing alterations or improvements as defined by the California Building Code and California Green Building Code. These codes define alterations and improvements as any construction to an existing structure which enhances or improves the structure. Construction related to repairs or maintenance of the structure is not considered to be an alteration or improvement.