Loading...
HomeMy WebLinkAbout214886_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10188216 PROJECT ADDRESS: 1851 E First St Unit# 630 PLAN CHECK ENGINEER: Ahangian, KathyTEL:714 647-5812FAX:714 647-5897 TYPE OF CONSTRUCTION: I A, SPK OCCUPANCY CLASSIFICATION(S): B PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 2/10/2016 INITIAL REVIEW 2/27/2016 EXPIRATION 8/8/2016 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Randall S Patrick 3. TEL: (949)724-1499 FAX: (949)724-1877 VALUATION:$176,000.00 EMAIL: rand@spaces-oc.com FLOOD ZONE:X-0602320277J APPLICABLE CODE: 2013 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5812 for an appointment.Please return marked up set of drawings with corrections.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Police Department approval on the corrected/final set of drawings (647-5840) - Public Works Agency approval (647-5039) - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceProvide complying exiting plan for the “reminder” area. Note the use of adjacent units.( Show floor plan for adjacent suite).Provide typical complete section view through one-hour corridor(s) showing compliance with CBC Sections 1017 and 708: - Size, spacing, and material of framing members. Note gauge and ICC number and installation/construction requirements for metal framing members. - Method of attaching framing to the building structure. Compliance shall be shown with CBC Section 1607.13 for lateral support of the walls. Do not support top of walls to suspended ceiling system unless calculations and drawings prepared by a registered engineer are submitted for review. Submit structural engineering calculations for walls in rooms with a floor to building structure above height greater than 14’. - Sheathing material and details of attachment. Note type, size, and spacing of fasteners. - Height of partition, suspended ceiling, structure above.Note on the drawings CBC Section 715 requirements for a pair of doors installed in a one-hourcorridor wall. - A labeled assembly having a fire-protection rating of not less than 20 minutes. - Self-closer or automatic-closer actuated by a smoke detector. - Automatic flush bolts, the door leaf having the automatic flush bolts shall have no doorknob or surface- mounted hardware. The unlatching of any leaf shall not require more than one operation. - Full mortise hinges – three minimum. - Tight-fitting clearances and provided with a gasket so installed as to provide a seal where the door meets the stop on both sides and across the top. Clearances for a pair of swinging doors shall be as follows: With a minus 1/16” tolerance – 1/8” along the top, 1/8” along the hinge and latch jambs, 1/8”along the meeting edge of the doors, and ¼” at the bottom of the doors. - An overlapping astragal extending the full height of the doors is required along the meeting edges of the doors. A coordinating device is also required to insure proper closing.”Provide on the drawings a complete door schedule, showing: - Door sizes (CBC Sections 1008.1.1 and 1133B.2) - Hardware complying with exiting and disabled accessibility requirements (CBC Sections 1008.1.8 and 1133B.2.5)Show thickness of the side lights and show it is tempered.It is the project designer’s/property owner’s responsibility to show compliance on the drawings with all applicable Federal and State Accessibility Standards.Drawings submitted to the Building Division for review shall provide the following information to insure compliance with CBC Section 1134B/Chapter 11B: - An accessible entrance - An accessible route to the altered area - Accessible restrooms - Accessible telephone (if any) - Accessible drinking fountains, and - Parking, signage and alarmsProvide minimum 18” clearance at the strike edge of door at the pass way.Provide minimum 12 “clearance at the strike edge of the pass way, per red mark.Show height of the microwave is in compliance with disabled access.Show depth of the microwave in breakroom is in compliance with disabled access.CBC 11B-604.8.1.3, provide 66” clearance in disabled toilet if bottom of the partition is less than 9”.Provide 36”x48” clear space at the front of urinals.CBC 11B-604.8.1.2 , the door opening shall be 4” maximum from the side wall or partition farthest from the water closet.Provide complete 1-Hr fire resistive construction for walls in the suite entry.Provide ICC report and span table for metal studs. If T-bar ceiling is existing, please identify of the legend on sheet A2. Otherwise provide detail.