Loading...
HomeMy WebLinkAbout210844_3_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10186859 PROJECT ADDRESS: 1622 3/4 N Main St Unit# WCC02 PLAN CHECK ENGINEER: Mazarji, ZacTEL:714 647-5831FAX:714 647-5897 TYPE OF CONSTRUCTION: II B, SPK OCCUPANCY CLASSIFICATION(S): B PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 10/13/2015 New 10’x9’ platform with no roof to install equipment located on the deck/ roof of existing high rise building. INITIAL REVIEW 10/22/2015 EXPIRATION 4/10/2016 RECHECKS: 1.2/8/2016 PROJECT APPLICANT CONTACT PERSON: 2. Martin Doubek 3. TEL: (949)760-3929 FAX: (949)760-3931 VALUATION:$125,000.00 EMAIL: martind@jrainc.net FLOOD ZONE:X-0602320163J Recheck: 2/8/2016All drawings and supporting documents shall be prepared, stamped and signed by a California licensed structuralengineer. Provide as built drawings to show complete framing plan of existing deck/roof for clarification load path of vertical and lateral loads. Submit structural calculations to justify size of existing girder. (Complete existing framing plan of deck/roof is required for clarification on vertical and lateral load path) Submit structural calculations to address additional lateral loads imposed by new structure to existing high rise building. Reference structural calculations pages 29 and 30, provide documentations to justify the assumed concrete strength of F’c of 5Ksi. The use of “Ty fo SCH-41”, does provides required flexural capacity to overcome the deficient existing joists, however structural calculations is required to demonstrate the existing beams is not deficient in compression as well, specifically when applying 2 layers of “Ty fo SCH-41”, to increase the tension capacity of existing beam 1 and 2. Please note the concern is when, beam tension zone is increased with use of “Ty fo SCH-41”, than the beamcompression zone is weaken further moreand causing the beam to fail at compression zone. Acceptance of proposed system (“Tyfo SCH-41”), is pending acceptance of Building Official. (ICC report ESR 2103 page 4). Proposed system is not accepted at this time. Please add a note on the structural drawings that existing wall, slab and beam/s is to be x-ray to insure there is no damage to existing re-bars. Note on the drawings all special inspection items for this project: The structural engineer of record shall provide periodic and final inspections for all structural elements to ensure completed construction agrees with his/her design. Other structural inspections required by the engineer or architect in responsible charge of the structural design work. Special inspections required by ICC,ESR 2103 Research Report. APPLICABLE CODE: 2013 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.(when needed) Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please return marked up set of drawings with corrections.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information. Please remove any electrical plans.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process.Public Works Agency approval (647-5039)Fire Department approval on the corrected/final sets of drawings. SPK may be required for equipment enclosure. Please contact Mr. Ruben Colmenares at 714-573-6100. - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceProvide structural calculations by a California licensed structural engineer for vertical and lateral analysis for proposed work for followings;Sheet S-4, detail #6Sheet S-5, details 1, 2, 3 and 7.Sheet S-6, detail # 3.Sheet S-6.1, detail # 3.Sheet S-6.2, details # 1, 2, 3, 4 and 5.Additional plan check comments may apply to this project.The valuation of improvements for the subject building permit application has been estimated at $125,000.00 Additional 2 hours accelerated plan check fee will be charged at time of building permit issuance. Provide as built drawings of existing office high-rise building roof deck framing where modifications are to be made for proposed new work. Dimensioned roof/deck framing is required. Reference Sheet A-6, detail #2, Provide structural calculations by California licensed structural engineer for wall mounted cable tray and indicate distance from tray to roof deck. Please note on the drawings that special inspection is required for all anchor bolts on architectural and architectural drawings.Provide X-ray note on structural drawings for deeming the location of existing rebar’s not to be damaged by anchoring system for new work. Reference Sheet S-3.1, clarify 2 hour fire rating on this page and when applicable, reference each fire rating assembly to Table 7 and item number of 2013 CBC, on the drawings.Indicate distance from exterior wall of equipment enclosure to property lines and call out the required fire rating of new walls and floor based on Table 601 and 602 of 2013 CBC. Reference each fire rating assembly to Table 7 and item number on the drawings.Provide structural calculations by a California licensed structural engineer for vertical and lateral analysis for proposed work for followings; (Missing calculations) Sheet S-4, detail #6Sheet S-5, details 1, 2, 3 and 7.Sheet S-6, detail # 3.Sheet S-6.1, detail # 3.Sheet S-6.2, details # 1, 2, 3, 4 and 5.Additional plan check comments may apply to this project.