HomeMy WebLinkAbout213444_2_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
10187768
PROJECT ADDRESS:
2165 S Grand Ave
PLAN CHECK ENGINEER:
Chehade, NabilTEL:714
647-5848FAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
B
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
12/28/2015
INITIAL REVIEW
2/24/2016
EXPIRATION
6/25/2016
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Saeed Kamkar
3.
TEL:
(949)307-2723
FAX:
VALUATION:$7,180.00
EMAIL:
Saeed@saeeddesignstudio.com
FLOOD ZONE:X-0602320278J
APPLICABLE CODE: 2010 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTSMeetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5848 for an appointment.Specify the occupancy group and use of the warehouse and of the holding area.( use the designation IIIB)Specify the rating of the wall separating the warehouse from the offices; please note that the wall must be an occupancy or area separation wall, the fire rating of openings in those walls need to match that of the wall, and not be a 20 minute rated as required in corridors.( The wall legend should include the entire rated wallThe loading area for the parking space must be located on the passenger side.Provide specification of cold formed ceiling joists.( ICC report for the metal joist used)Provide dimension to show the span of the metal tubes supporting the ceiling joists.Provide a detail to show how the glass panels are supported to the steel frame.Clarify on plans and attach a sheet to the documentation form clarifying the accessibility work that is being done as part of this TIPlease note if there is any work to be done in the public way/sidewalk, public works approval would be required..The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Police Department approval on the corrected/final set of drawings (647-5840)
- Public Works Agency approval (647-5039)( if work in the public way)
- Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceDetail 4 on S1 does not make sense, are you attaching the tube to an existing two hour wall by #10 tek?. Pay attention to the existing fire rated wall construction .Clarify what are the finishing material on the ceiling joists.Dimension the width of the glass panels within the tubes.The interior wall between the two offices; is it the same as the wall shown in section A? How is the top tube connected to the tubes perpendicular to it.Bracing details don’t make sense section A and elevation A-A, please have a look at them clarify how many of them where they are located etc.Please note the braces are supporting the steel tubes on the top of the glass partition. Either the tubes can span between points of support, or the ceiling with the drywall creates a diaphragm or braces are provided to support the top tubes, either case proper details or analysis should be provided. Detail 1 is not clear or adequate. Support the brace to the metal tube not the ceiling joist.