Loading...
HomeMy WebLinkAbout216385_2_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10188755 PROJECT ADDRESS: 3355 S Bristol St PLAN CHECK ENGINEER: Heidari, FredTEL:714 647-5862FAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): A-2 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 3/29/2016 INITIAL REVIEW 4/18/2016 EXPIRATION 9/25/2016 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Kevin M Friedman 3. TEL: (714)913-8393 FAX: (866)425-4336 VALUATION:$60,000.00 EMAIL: edaincorporated@aol.com FLOOD ZONE:X-0602320259J APPLICABLE CODE: 2013 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTSResubmit 2corrected sets of plans.The drawings/information submitted for Building Safety Division review is incomplete. The applicant shall, prior to resubmitting, complete all construction documents to show compliance with the 2013 California Building Standards Code with local amendments.All drawings and supporting documents shall be prepared, stamped and signed by a California licensed architect or registered civil engineer.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Police Department approval on the corrected/final set of drawings (647-5840) - Public Works Agency approval (647-5039) - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceProvide structural calculations and drawings, stamped and signed by a California licensed architect or registered civil engineer for: - New mechanical equipment on roof (note on Roof Framing Plan weight of each existing and new piece of equipment on the roof) - The Roof Framing Plan submitted for this permit calls 13 X 5 timber for the roof framing. Please provide spec. for this timber and modify the calculation to show that this timber can resist the proposed equipment loads.Provide construction details for attaching the new roof mountain equipment to the roof framing members.Provide construction details for new opening into the roof for the proposed equipment.The equipment load on the roof framing plan shall match the loads in the structural calculation. See the red mark on the plan for this item.