HomeMy WebLinkAbout217901_1_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10189227 PROJECT ADDRESS: 1429 S Maple St PLAN CHECK ENGINEER: Chehade, NabilTEL:714 647-5848FAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): R-3, U PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 5/11/2016 INITIAL REVIEW 6/22/2016 EXPIRATION 11/7/2016 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Araceili Maciel 3. TEL: (714)285-1121 FAX: VALUATION: $93,289.00 EMAIL: aadrafting@msn.com FLOOD ZONE: X-0602320276J Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2010 California Residential Code (CRC); 2010 California Building Code (CBC); CMC = 2010 California Mechanical Code; CPC = 2010 California Plumbing Code; CEC = 2010 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5848 for an appointment. All drawings and supporting documents shall be prepared, stamped, and signed by a California licensed architect or registered professional engineer. (CRC R301.1.3, CBC 107.1 and 107.3.4.1).All persons preparing plans for others shall sign those plans. Business and Professions Code Chapter 3, Division 3, Section 5536.1 (a). This review does not include mechanical, plumbing or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, and electrical work. Call 647-5800 for information. The applicant shall obtain clearances/approvals for the following, prior to building permit issuance: -Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. - Fire Department approval on the corrected/final set of drawings (647-5839 or 647-5700). -Police Department approval on the corrected/final set of drawings (647-5840). -Public Works Agency approval (647-5039). -Proof of Worker's Compensation Insurance shall be required at the time of permit issuance. - School District Compliance Certificate; and a copy of the building permit application, signed by the plan check engineer, shall be required by the School District to verify the scope of the work. -Grading Permit. Application is made through the Building Safety Division (647-5800) and the plan review is by the Public Works Agency (647-5039).Projections of dwelling units and accessory buildings without an automatic residential fire sprinkler protection are not permitted less than 2 feet to the property line and are required to be 1 hour fire rated on the underside with a fire separation distance between 2 feet and 5 feet. (CRC Table R302.1 (1)) Walls of dwelling units and accessory buildings without an automatic residential fire sprinkler protection with a fire separation distance less than 5 feet are required to have a full one hour rating. (CRC Table R302.1 (1)) Openings are not permitted less than 3 feet to the property line. In dwelling units and accessory buildings without an automatic residential fire sprinkler protection openings are limited to 25 percent the wall area when fire separation distance is greater than 3’ and less than 5’. (CRC R302.1 (1)) For an FAU located in the attic provide a minimum access of 22 x 30 inches, a 24-inch wide walkway, a 30-inch deep work platform, and electric light outlet adjacent to the furnace and switched by the opening. (CMC 904.11 & 305)For each enclosed attic space with a maximum vertical height greater than 30 inches, provide a minimum of 22 x 30 inches attic access. (CRC R807.1) Interior spaces intended for human occupancy shall be provided with heating facilities capable of maintaining a room temperature of 68 degrees Fahrenheit at a point 3 feet above the floor and 2 feet from exterior walls in all habitable rooms. (CRC R303.8)Provide detail of roof construction assembly. (CRC 902.1) Energy forms call for a ventilated attic, are you mechanically ventilating the attic?Callout attic vent locations, sizes and types on plans. Provide attic ventilation calculation to show minimum ventilation is provided. (CRC R806.2)The total net free ventilating area shall not be less than 1/150or 1/300 when a Class I or II vapor barrier is installed on the warm-in-winter side of the ceiling. (CRC R806.2) The City has encountered a large number of inspection problems arising from a lack of specific framing details. The following listed items are required to be shown on the plans (CBC 107.1): - All plumbing walls are to be framed with a minimum of 6" studs. - Double walls used as plumbing walls are to be a minimum of 8" wide and no "flat" studs permitted. Staggered studs are acceptable. - Permissible notching and boring of joists are to be shown on the plans and shall not exceed CBC Section 2308.10.4.2 allowances. - Notching of exterior and bearing/nonbearing walls shall not exceed 25%/40% respectively. Bored holes in bearing/nonbearing walls shall not exceed 40%/60% respectively. In no case shall the edge of the bored hole be nearer than 5/8 inch to the edge of the stud. (2308.9.10 and 2308.9.11) - Header and trimmer details for doors and windows are to be shown with full length trimmers, specifying the size of the header and trimmer. (2308.10.4.3) - All framed buildings which are required to be designed by an engineer or architect must be signed prior to submission into plan check - All stud bearing walls are required to comply with the minimum requirements for load bearing walls. Show location(s) and provide typical construction details. (2308.9) - Other methods may be used provided a satisfactory engineering and/or architectural design is submitted. Provide a tabulation on 1st sheet of plans specifying all items requiring special inspection.The construction documents shall provide sufficient clarify to indicate the location, nature, and scope of the proposed green building features. CGBC 102.2Plans shall indicate method of verification of compliance with all CALGreen requirements. Third party or other methods shall demonstrate satisfactory conformance with mandatory measures. Include City's Mandatory Measures Checklist copies onto plans.Surface drainage. Submit surface drainage plans to indicate how surface water shall not enter buildings. Examples of methods to manage surface water include: 1. Swales; 2. Water collection; 3. French Drains; 4. Water retention gardens; 5. Other water measures which keep surface water away from buildings and aid in groundwater recharge. CGBC 4106.3Plumbing fixtures and fittings shall meet the standards referenced in CGBC Table 4.303.3. CGBC 4303.3Seal openings in the building envelope in compliance with the California Energy Code (CEC). Annular spaces around pipes, electric cables, conduits or other openings in plates at exterior walls shall be protected by closing such openings with cement mortar, concrete masonry, or a similar method acceptable to the enforcing agency. CGBC 4.406.1Indicate on the plans that a construction waste management plan and documentation demonstrating compliance with the plan shall be submitted that: - Identifies the materials to be diverted from disposal by recycling, reuse on the project or salvage for future use or sale. - Specifies if materials will be sorted on-site or mixed for transportation to a diversion facility. - Identifies the diversion facility where the material collection will be taken. - Identifies construction methods employed to reduce the amount of waste generated. - Specifies that the amount of materials diverted shall be calculated by weight or volume, but not by both. CGBC 4.408.2, 4.408.2.1Note on the drawings that an Operation and Maintenance Manual with content per CGBC 4.410.1 and in a format acceptable to the enforcing agency shall be placed in the building at the time of final inspection. CGBC 4.410.1. Refer to RCD residential guide for manual format and suggested content.All duct openings and other air distribution component openings shall be protected during storage on the construction site until final start-up with tape, plastic, sheet metal, or other acceptable methods to reduce the amount of dust and debris which may collect in the system. CGBC 4.504.1Finish materials shall comply with COBC 4.504.2. Provide a statement on the title sheet of the plans that this project shall comply with following codes: - 2010 California Residential Code (CRC) - 2010 California Building Code (CBC) - 2010 California Electrical Code (CEC) - 2010 California Mechanical Code (CMC) - 2010 California Plumbing Code (CPC) - 2010 California Green Building Standards Code (CGBS) or CALGreen - 2010 California Energy Code (CEnC) - City of Santa Ana Municipal CodeNote on the plans that aerosol adhesives, smaller unit sizes of adhesives, and sealant or caulking compounds (in units of product, less packing, which do not weigh more than 1 pound and do not consist of more than 16 fluid ounces shall comply with statewide VOC standards and other requirements, including prohibitions on the use of certain toxic compounds, of CCR, Title 17, commencing with Section 94507. 4 CGBC.504.2.1, subsection 2VOC Content Limits for Architectural Coatings (Architectural Paints) shall comply with CGBC Table 4.504.3.Aerosol paints and coatings shall meet the requirements of Sections 94522(a)(3), 94522(c)(2), and (d)(2) of California Code of Regulations, Title 17 commencing with Section 94520. CGBC 4.504.2.3Verification of compliance with finish materials shall be provided at the request of the enforcing agency. Documents may include, but not limited to the following: - Manufacturer's product specification. - Field verification of on-site product containers. - Other methods approved by the local jurisdiction.Carpets shall meet one of the following: 1. Carpet and Rug Institute's Green label plus program, 2. California Department of Public Health Standard Practice for the testing of VOCs (Specification 01350), 3. NSF/ANSI 140 at the Gold Level. 4. Scientific Certifications Systems Indoor AdvantageTM Gold. CGBC 4.504.3Carpet cushion shall meet the requirements of the Carpet and Rug Institute Green Label Program, carpet adhesive shall meet the requirements of CGBC Table 4.504.1. CGBC 4.504.3.1,4.504.3.2For resilient flooring, at least 50 percent of the floor area shall comply with VOC emission limits defined in the Collaborative for High Performance Schools (CHPS) Low-emitting Materials List or certified under the Resilient Floor Covering Institute (RFCI) FloorScore program. CGBC 4.504.4Hardwood plywood, particleboard, and medium density fiberboard composite wood products shall meet the requirements for Formaldehyde Limits in CGBC Table 4.504.5.Note on the plans that documentation shall be provided to indicate compliance with CGBC 4.504 and shall include at least one of the following: Product certifications and specifications, chain of custody certifications, or other methods acceptable to the enforcing agency. CGBC 4.504.5.1Add a note to plans the building materials with visible signs of water damage shall not be installed. CGBC 4.505.3Moisture content of Building Materials, and verification, shall meet the requirements of CGBC 4.505.3.Bathroom exhaust fans shall be ENERGY STAR compliant, ducted to terminate outside the building, and controlled by a humidistat capable of being adjusted between the relative humidity range of 50 to 80 percent. CGBC 4.506