Loading...
HomeMy WebLinkAbout211346_4_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10187059 PROJECT ADDRESS: 4901 W Sixth St PLAN CHECK ENGINEER: Mazarji, ZacTEL:714 647-5831FAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): R-3 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 11/2/2015 INITIAL REVIEW 12/1/2015 EXPIRATION 4/30/2016 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Tony Dang 3. TEL: (714)342-8866 FAX: VALUATION: $44,254.00 EMAIL: Model.builders@yahoo.com FLOOD ZONE: A-0602320256J You are scheduled for a meeting at Permit counter on Monday (12-7-2015) at 2:00pm to review incomplete drawings with Plan Check Engineer, Zac Mazarji. Please respond to this e-mail or call 714-647-5831 to confirm or re-schedule. We strongly advise you to have the engineer or architect of records to attend this meeting to avoid delaying on obtaining a Building permit for proposed project. This project is in a special flood hazard area designated on the flood insurance rate map (FIRM) as zone A or AE. This zone requires that the lowest finish floor elevation (including basement) of the structure shall be at (or above) base flood elevation determined by a hydrology study for the A zone, or at (or above) the base flood elevation specified for the AE zone, on the flood insurance rate map. All elevations must be referenced to the National Geodetic Vertical Datum. Reference should be made to the Flood Plain Management Ordinance, Santa Ana Municipal Code, Chapter 7, for complete requirements. Drawings shall show compliance with said ordinance including noting flood zone and finish floor elevation." Note on plans: "A Federal Emergency Management Agency National Flood Insurance Program ELEVATION CERTIFICATE shall be completed by a California Licensed Land Surveyor or California Registered Civil Engineer who is authorized to practice land surveying. The completed ELEVATION CERTIFICATE must be submitted to the Building Inspector at the time of foundation inspection, and a final certificate must be submitted at the time of final inspection."