Loading...
HomeMy WebLinkAbout215989_2_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10188612 PROJECT ADDRESS: 4520 W Penny Ave PLAN CHECK ENGINEER: Mazarji, ZacTEL:714 647-5831FAX:714 647-5897 TYPE OF CONSTRUCTION: V B, SPK OCCUPANCY CLASSIFICATION(S): R-3, U PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 3/17/2016 781 of residential addition INITIAL REVIEW 4/25/2016 EXPIRATION 9/13/2016 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Man Nguyen 3. TEL: (714)606-3010 FAX: VALUATION: $106,103.00 EMAIL: Mannguyenusa@msn.com FLOOD ZONE: X-LOMA Residential Code (CRC); 2013 California Building Code (CBC); CMC = 2013 California Mechanical Code; CPC = 2013 California Plumbing Code; CEC = 2013 California Electrical Code; T = Table; ICC = International Code Council.(when meeting is needed) Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5831 for an appointment. This review does not include mechanical, plumbing or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, and electrical work. Call 647-5800 for information. The applicant shall obtain clearances/approvals for the following, prior to building permit issuance: -Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. - School District Compliance Certificate; a copy of the building permit application, signed by the plan check engineer, shall be required by the School District to verify the scope of work. Refer to the attached handout. - Public Works Agency approval (647-5039). - Proof of Worker's Compensation Insurance shall be required at the time of permit issuance. Please refer to attached to Residential Cal Green and SB 407Forms and once information on the Forms is completed than provide a copy on the drawings.Please refer to red marks on the drawings for architectural, structural and T-24 plan check comments. Revise drawings to show compliance and re-submit the mark-up drawings toBuilding department. Resubmit 3 corrected sets of plans.