Loading...
HomeMy WebLinkAbout212534_3_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10187488 PROJECT ADDRESS: 515 N Main St PLAN CHECK ENGINEER: So, AnsonTEL:714 647-5830FAX:714 647-5897 TYPE OF CONSTRUCTION: V B, SPK OCCUPANCY CLASSIFICATION(S): A-2 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 12/10/2015 INITIAL REVIEW 1/5/2016 EXPIRATION 6/7/2016 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Jimmy Nhieu 3. TEL: (949)466-3878 FAX: VALUATION:$600,000.00 EMAIL: Jimmy@kingkongds.com FLOOD ZONE:X-0602320276J APPLICABLE CODE: 2013 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5830 for an appointment.Please return marked up set of drawings with corrections.Sheet E1.0: Specify a third-party research report number for the proposed elevator under keynote #4.Sheet E1.0 and elevator specifications: Elevator specifications complying with Section 11B-408 is not available on plan. At a minimum, provide notes from Section 11B-408 on plan.Sheet A2.1: Provide a cross-sectional drawing at elevator landing on the second floor. Show guard rail or wall partition details at the edge of landing adjacent to stairway. In addition, show minimum headroom clearance requirement is met on cross-sectional drawing.Sheet S2.1: The length of elevator enclosure is 7’-6” along the direction of elevator door opening. The footing width is 9’-6”. However, edge distance requires 18 inches edge-distance at each end of footing length. Extend footing depth and show 18 inches edge distance on foundation plan at each end.Sheet S2.1: Embedment length at hold-down HDU-14 is 12 inches measured from the low-side of concrete footing. The elevator foundation is only 12 inches deep. Ensure embedment depth plus concrete cover depth is adequate.