HomeMy WebLinkAbout215989_3_Corrections.docxRESIDENTIAL PLAN CHECK
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
10188612
PROJECT ADDRESS:
4520 W Penny Ave
PLAN CHECK ENGINEER:
Mazarji, ZacTEL:714
647-5831FAX:714
647-5897
TYPE OF CONSTRUCTION:
V B, SPK
OCCUPANCY CLASSIFICATION(S):
R-3, U
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
3/17/2016
781 of residential addition
INITIAL REVIEW
4/25/2016
EXPIRATION
9/13/2016
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Man Nguyen
3.
TEL:
(714)606-3010
FAX:
VALUATION: $106,103.00
EMAIL:
Mannguyenusa@msn.com
FLOOD ZONE: X-LOMA
Residential Code (CRC); 2013 California Building Code (CBC); CMC = 2013 California Mechanical Code; CPC = 2013 California Plumbing Code; CEC = 2013 California Electrical Code; T = Table; ICC = International Code Council.(when meeting is needed) Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5831 for an appointment.
This review does not include mechanical, plumbing or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, and electrical work. Call 647-5800 for information.
The applicant shall obtain clearances/approvals for the following, prior to building permit issuance:
-Planning Division approval on the corrected/final set of drawings (647-5804). Previously
approved plans should be submitted to expedite the process.
- School District Compliance Certificate; a copy of the building permit application, signed by the plan check
engineer, shall be required by the School District to verify the scope of work. Refer to the attached handout.
- Public Works Agency approval (647-5039).
- Proof of Worker's Compensation Insurance shall be required at the time of permit issuance.
Please refer to attached to Residential Cal Green and SB 407Forms and once information on the Forms is completed than provide a copy on the drawings.Please refer to red marks on the drawings for architectural, structural and T-24 plan check comments. Revise drawings to show compliance and re-submit the mark-up drawings toBuilding department. Resubmit 3 corrected sets of plans.