Loading...
HomeMy WebLinkAbout215876_2_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10188572 PROJECT ADDRESS: 1113 S Gates St PLAN CHECK ENGINEER: Chehade, NabilTEL:714 647-5848FAX:714 647-5897 TYPE OF CONSTRUCTION: V B, SPK OCCUPANCY CLASSIFICATION(S): R-3, U PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 3/15/2016 INITIAL REVIEW 4/13/2016 EXPIRATION 9/11/2016 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Nhon Dinh 3. TEL: (714)900-2001 FAX: VALUATION:$243,810.00 EMAIL: koifilter@yahoo.com FLOOD ZONE:X-0602320256J Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2007 California Building Code (CBC); MC = 2007 California Mechanical Code; PC = 2007 California Plumbing Code; EC = 2007 California Electrical Code; T = Table; ICC = International Code Council.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5848 for an appointment.Please note this unit is required to have asprinkler system.. The applicant shall obtain clearances/approvals for the following, prior to building permit issuance: -Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. -Police Department approval on the corrected/final set of drawings (647-5840). -Public Works Agency approval (647-5039). -Proof of Worker's Compensation Insurance shall be required at the time of permit issuance. - School District Compliance Certificate; and a copy of the building permit application, signed by the plan check engineer, shall be required by the School District to verify the scope of the work. -In addition to other fees, a "Park Acquisition and Development Fee" in the amount shownbelow shall be required pursuant to a resolution of the City Council for the Recreation andCommunity Services Agency; net addition of 6 bedroom(s). Amount of $5,998.43; net addition of 5 bedrooms Amount of $5,391.50; net addition of 4 bedrooms Amount of $4,869.15; net addition of 3 bedrooms Amount of $3,629.16; net addition of 2 bedrooms Amount of $2,723.74; net addition of 1 bedroom The following are required for attached garage/carport: --Self-closing, tight-fitting,- -Door may swing into the garage if floor or landing in the garage is not more than 0.50 inch lower than the door threshold. Changes in elevation between 0.25 and 0.50 shall have a 2:1 bevel. (1008.1.6) (add note and show landing) Provide an ICC report/UL listing for the fire place; please note the LA basin Air quality agency does not allow the installation of wood burning fire places.(show on plans) New one and two family dwellings and town-homes with attached garages shall install a listed raceway to accommodate a dedicated 208/240 volt branch circuit. The raceway shall not be less than 1” inside diameter. The raceway shall originate at the main service or subpanel and shall terminate inside a listed cabinet, box or other enclosure in close proximity to the proposed location of an EV charger. The service panel shall have the capacity to install a 40-amp minimum dedicated branch circuit and space reserved to permit installation of a branch circuit overcurrent protective device. ( Show location of terminated raceway on floor plan or electrical plan) The service panel or subpanel circuit directory shall identify the overcurrent protective device as “EV CAPABLE”.( add note to electrical plan)