Loading...
HomeMy WebLinkAbout206971_2_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10185509 PROJECT ADDRESS: 126 E Dyer Rd Unit# C PLAN CHECK ENGINEER: Mazarji, ZacTEL:714 647-5831FAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): B PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 6/23/2015 INITIAL REVIEW 8/4/2015 EXPIRATION 12/20/2015 RECHECKS: 1.6-8-2016 PROJECT APPLICANT CONTACT PERSON: 2. Teresa Le 3. TEL: (714)656-5702 FAX: VALUATION:$35,900.00 EMAIL: FLOOD ZONE:X-0602320278J Re-check: 6-8-2016 You are scheduled for a meeting at Permit counter on Tuesday (8-14-2016) at 2:00pm to review drawings with Plan Check Engineer, Zac Mazarji. Please respond to this e-mail or call 714-647-5831 to confirm or re-schedule. APPLICABLE CODE: 2013 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5831 for an appointment.Please return marked up set of drawings with corrections.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information. The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Proof of Worker’s Compensation Insurance shall be required at the time of permitDrawings submitted to the Building Division for review shall provide the following information (Dimensioned drawings/details) to insure compliance with CBC Chapter 11B:A. An accessible entrance. B. An accessible route to the altered area. C. Accessible restrooms. D. Accessible telephone (if any). Accessible drinking fountains, andParking, signage and alarms. Priority shall be given to those elements that will provide the greatest access in the above order. Valuation of proposed project is calculated as $35,900.00. A minimum of 20% of valuation of construction is required to be spent towards providing disabled access in the priority order noted in the immediate previous item as noted in Division 2 of Chapter 11B of 2013 CBC. Revise the drawings to show compliance. Show both existing elements and how they will be upgraded to current standards. Complete and sign attached “disabled accessibility documentation” form.Please refer to red marks on the drawings for additional plan check comments. Revise drawings to show compliance.