HomeMy WebLinkAbout218916_1_Corrections.docxRESIDENTIAL PLAN CHECK
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
10189501
PROJECT ADDRESS:
1817 W Fifteenth St
PLAN CHECK ENGINEER:
So, AnsonTEL:714
647-5830FAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
R-3, U
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
6/14/2016
INITIAL REVIEW
8/8/2016
EXPIRATION
12/11/2016
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Ngon Le
3.
TEL:
(714)725-5920
FAX:
VALUATION: $0.01
EMAIL:
FLOOD ZONE: X-0602320144J
Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2013 California Residential Code (CRC); 2013 California Building Code (CBC); CMC = 2013 California Mechanical Code; CPC = 2013 California Plumbing Code; CEC = 2013 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5830 for an appointment.The drawings/information submitted for Building Safety Division review is incomplete. The applicant shall, prior to resubmitting, complete all construction documents to show compliance with the 2013 California Building Standards Code with local amendments and to clearly indicate the scope of work under this building permit application. There may be additional requirements when complete construction drawings and supporting data is submitted for Building Safety Division review.
Please see corrections on submitted plans. Red marked set must be returned with revised plans. Plans resubmitted without the red markup set may result in delayed review time and additional plancheck fees.
All drawings and supporting documents shall be prepared, stamped, and signed by a California licensed architect or registered professional engineer. (CRC R301.1.3, CBC 107.1 and 107.3.4.1).All persons preparing plans for others shall sign those plans. Business and Professions Code Chapter 3, Division 3, Section 5536.1 (a).
This review does not include mechanical, plumbing or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, and electrical work. Call 647-5800 for information.
The applicant shall obtain clearances/approvals for the following, prior to building permit issuance:
-Planning Division approval on the corrected/final set of drawings (647-5804). Previously
approved plans should be submitted to expedite the process.
-Public Works Agency approval (647-5039).
- Proof of Worker's Compensation Insurance shall be required at the time of permit issuance.
- School District Compliance Certificate; and a copy of the building permit application, signed by
the plan check engineer, shall be required by the School District to verify the scope of the work.
In addition to other fees, a "Park Acquisition and Development Fee" in the amount shown below
shall be required pursuant to a resolution of the City Council for the Recreation and Community
Services Agency; net addition of ___2_____ bedroom(s).Amount of $4,006.57; net addition of 2 bedrooms
Prior to the issuance of building permit(s), tract maps, parcel maps, lot line adjustments, public way abandonments, covenant, conditions and restrictions (CC&R's), etc., related to the subject project must be legally recorded with the County of Orange.Provide valuation on this project.Sheet A-1Show drainage away from the addition. Specify slope and drainage directions on the site plan.Specify roof over-hang dimension on the roof plan. Provide one-hour fire protection detail underneath the eave for roof over-hang projection less than 5 foot from property line.
Provide building information on plans:
- Occupancy type: R3 / U
- Construction type: Type V – B
- Fire sprinklered: Yes / No
- Fire sprinkler type:(where applicable)
Provide a statement on the title sheet of the plans that this project shall comply with following codes:
- 2013 California Residential Code (CRC)
- 2013 California Building Code (CBC)
- 2013 California Electrical Code (CEC)
- 2013 California Mechanical Code (CMC)
- 2013 California Plumbing Code (CPC)
- 2013 California Green Building Standards Code (CGBS) or CALGreen
- 2013 California Energy Code (CEnC)
- City of Santa Ana Municipal CodeProvide cross ventilation for attic and each enclosed rafter space as specified in CRC Section R806. Callout attic vent locations, sizes and types on plans. Provide attic ventilation calculation to show minimum ventilation is provided. (CRC R806.2)The total net free ventilating area shall not be less than 1/150 or 1/300 when a Class I or II vapor barrier is installed on the warm-in-winter side of the ceiling. (CRC R806.2) The total net free ventilating area shall not be less than 1/300 when at least 50% and not more than 80% of the required ventilating area is provided by ventilators located in the upper portion of the space to be ventilated at least 3 feet above the eave or cornice vents with the balance of the required ventilation provided by eave or cornice vents. Show high/low vent locations on plans. (CRC R806.2)Sheet A-2Show the North Arrow directionShow smoke detector and carbon monoxide location on plan.Specify tempered glazing at shower/bath tub.Specify toilet clearance as follow:Fixtures shall be set level and in proper alignment with reference to adjacent walls. No water closet or bidet shall be set closer than fifteen (15) inches from its center to any side wall or obstruction nor closer than thirty (30) inches center to center to any similar fixture. The clear space in front of any water closet or bidet shall be not less than twelve-four (24) inches. Specify door size in bedroom #3 and #4.Sheet A-3Specify minimum 50 cfm at exhaust fan.Specify 44 inches maximum on egress window sill plate on East Elevation.Sheet S-1Provide structural connection detail at California framing section.Show dowel detail from new footing to existing footing at Hallway.Foundation plan indicates #4 rebars@18 inches on center. However, detail “13/SD1” shows #3 rebars at 18 inches on center. Verify discrepancy.Specify hold-down detail number on interior 7-foot shear-wall.Revise detail number to “18/SD1” at hold-down location.Specify hold-down “HDU2” at shear-wall along grid line “A”.