HomeMy WebLinkAbout219041_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10189549 PROJECT ADDRESS: 3960 S Main St Unit# A PLAN CHECK ENGINEER: Heidari, FredTEL:714 647-5862FAX:714 647-5897 TYPE OF CONSTRUCTION: V B, SPK OCCUPANCY CLASSIFICATION(S): B, M PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 6/16/2016 INITIAL REVIEW 6/28/2016 EXPIRATION 12/13/2016 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Richard De La Fuente 3. TEL: (714)560-8619 FAX: VALUATION:$800,000.00 EMAIL: rdelafuente@tait.com FLOOD ZONE:X-0602320278J APPLICABLE CODE: 2013 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5862 for an appointment.Clearly indicate the scope of work under this building permit application: - Construction drawings must clearly show all work to be done under the subject building permit application. - Delete all notes and details from drawings that are not a part of the work to be done under the subject building permit application. The permit application for this work refers to interior tenant improvement and drawing is not that clear. It shows a new building on the some of the sheets, see sheets A4.0, and A4.1. Please remove all the references to the future building from this drawing.The job address shall be corrected as marked on the plan by Planning Division.On sheet C1.0, under project data please modify the “PROPOSE BUILDING” note and the type of construction. Key note #2 on sheet A2.1 refers to detail for new stud wall; but no detail is provided. Please complete this note.See red mark/ notes for details 3, 4, & 5 on sheet A2.1. Revise this information and resubmit the revised plan for recheck.Provide full compliance with Section 13.5.6 of ASCE 7-10 for new suspended celling on the drawings. All drawings and supporting documents shall be prepared, stamped and signed by a California licensed architect or registered civil engineer.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Orange County Fire Authority approval on the corrected/final sets of drawings ((714)573-6100) - Police Department approval on the corrected/final set of drawings (647-5840) - Public Works Agency approval (647-5039) - County of Orange Health Department approval on the corrected/final set of drawings ((714)433-6000) - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceProvide typical section view detail of all new partitions and ceilings showing: - Size, spacing, and material of framing members - Note gauge and ICC Research Report number and installation/construction requirements for metal framing members. - It is the project designer’s responsibility to coordinate work with the various trades to ensure that the size of the wall cavity will be large enough to accommodate piping, fittings, ducts, etc. There has been a continuing field problem of 2½” wide metal studs not being able to accommodate plumbing pipes. - Method of attaching framing to the building structure. Compliance shall be shown with CBC Section 1607.13 for lateral support of the walls. Do not support top of walls to suspended ceiling system unless calculations and drawing prepared by a registered engineer are submitted for review. Submit structural engineering calculations for walls in rooms with a floor to building structure above height greater than 14’. - Heights of partition, suspended ceiling, structure above.Provide on the drawings a complete door schedule, showing: - Door sizes. Provide door number on the floor plan to match the door schedule. - Hardware complying with exiting and disabled accessibility requirements - Show compliance with the City of Santa Ana’s Security Ordinance (Contact the Santa Ana Police Department Crime Prevention Section by telephoning 714-647-5840)Note on drawing: “Exit doors shall be openable from the inside without the use of a key or any special knowledge or effort.”Regardless of the occupant load, there shall be a floor or landing on each side of a door. The floor or landing shall be not more than ½” lower than the threshold of the doorway. Change in level between ¼” and ½” shall be beveled with a slope no greater than 1:2. Change in level greater than ½” shall be accomplished by means of a ramp. Provide detailed sections and plan views showing compliance at all doorways requiring accessibility.Hand-activated door opening hardware shall be centered between 30” and 44” above the floor. Latching and locking doors that are hand activated and which are in a path of travel shall be operable with a single effort by lever-type hardware, by panic bars, push-pull activating bars, or other hardware designed to provide passage without requiring the ability to grasp the opening hardware. Locked exit doors shall operate as above in egress direction.Note on the drawings: “Maximum effort to operate doors shall not exceed 5 pounds for exterior doors and interior doors, such pull or push effort being applied at right angles to hinged doors and at the center place of sliding or folding doors”.CBC required the bottom 10” of all doors except automatic and sliding shall have a smooth uninterrupted surface to allow the door to be opened by a wheelchair footrest without creating a trap or hazardous condition.Note on the drawing: “Means of egress from all occupied parts of the building be provided with at least 1’ candle of light at floor level”. Show compliance on the drawings.If a walk crosses or adjoins a vehicular way, and the walking surfaces are not separated by curbs, railings or other elements between the pedestrian areas and vehicular areas, the boundary between the areas shall be defined by a continuous detectable warning which is 36” wide, complying with the CBC.Provide a clear site plan to show compliance on the plan.Accessible parking spaces serving a particular building shall be located on the shortest accessible route of travel from adjacent parking to an accessible entrance.Please modify the site plan to show compliance with this requirement.Surface slopes of accessible parking spaces shall be the minimum possible and shall not exceed 1 unit vertical to 50 units horizontal (2% slope) in any direction.Revise the drawings to show the words NO PARKING shall be painted on the ground within each loading and unloading access aisle. This notice shall be painted in white letters no less than 12” high and located so that it is visible to traffic enforcement officials. Provide completely dimensioned floor plans, elevations and sections of sanitary facility insuring wheelchair clearances complying with CBC Section 11B604 and the California Plumbing Code.Provide complete grab bar details on the drawings showing compliance with CBC Section 11B-604 including structural strength to support a 250 pound point load.Show compliance with Section 11B-604.7 for location of toilet paper dispenser on the plan.Note on the drawings hot water and drain pipes under lavatory shall be insulated.The bottom of the mirror is no higher than 40” from the floor.Glass and glazing shall be in accordance with CBC Chapter 24. Note on the drawings all windows and doors having glazing. Indicate the type and thickness of each light of glazing on the drawings.Provide structural calculations and drawings, stamped and signed by a California licensed architect or registered civil engineer for: - New mechanical equipment on roof (note on Roof Framing Plan weight of each existing and new piece of equipment on the roof) - New equipment screening on roof - Canopy - Trash Enclosure (see attached handout.) - Any other structural alterationSee other red marks on the plan.Please resubmit the marked up set of plans with revised ones for recheck.