Loading...
HomeMy WebLinkAbout214040_2_Corrections.docxSPC PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10187953 PROJECT ADDRESS: 660 S Santa Fe St PLAN CHECK ENGINEER: Chehade, NabilTEL:714 647-5848FAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): F-1 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 1/14/2016 INITIAL REVIEW 3/3/2016 EXPIRATION 7/12/2016 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Nathan Rainey 3. TEL: (714)864-4310 FAX: (714)648-0291 VALUATION:$60,000.00 EMAIL: Nathan@precisionpowder.com FLOOD ZONE:X-0602320276J APPLICABLE CODE: 2010 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5848 for an appointment.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.Specify the valuation of work under this permit.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. - Fire Department approval on the corrected/final sets of drawings ((714) 573-6100). - Police Department approval on the corrected/final set of drawings (647-5840). - Public Works Agency approval (647-5039). Provide a wall legend indicating whether the wall is: - Existing, new, or to be removed - A fire-resistive assembly - Bearing walls versus non-bearing partitionsIdentify the wall legend, make sure it is clear on the floor plan which parts are existing and which are new.Drawings submitted to the Building Division for review shall provide the following information to insure compliance with CBC Section 1134B, Chapter 11B: - An accessible entrance - An accessible route to the altered area - Accessible restrooms - Accessible telephone (if any) - Accessible drinking fountains, and - Parking, signage and alarmsThis item applies to the proposed building where the work is being done which is building II. Please note that the address for building II is 660 and not 640. This project was submitted to the fire department with the wrong address; please make sure it is corrected.Priority shall be given to those elements that will provide the greatest access in the above order.This project should be checked by the fire department, and the occupancy classification should be verified. Please make sure the address shown on the fire department submittal is the right one.Specify if there any control area on the floor plan.Specify if there are any ICC approvals or City of La approval for any of the equipment being proposed to be installed. Any of the equipment proposed if not a listed piece of equipment will be treated as a tenant space with a specific occupancy. If it is a tenant space all partitions forming the space. Provide proper detailing and structural calcs. to justify the structural make up of all the equipment that are not listed. Please note that spray booth if an H occupancy and contained within 1-hr fire barrier as an accessory occupancy, the aggregate areas of all these accessory occupancies cannot exceed 10% of the entire building.Permit application shows a paint booth; p[lease note the paint booth could be an H occupancy, Please show the sizes of all paint booth existing and proposed.This applies to comments 12 to 15 shown above regarding treating the spray booth and the other equipment’s as separate rooms. If the equipment is listed or have a UL listing for the intended use, than show the UL number and anchoring of the equipment is acceptable. If the equipment is being fabricated in the warehouse, and there is no such approved listing for the product, than each space occupied by the equipment need to be assigned an occupancy group and the details for the installation of the partitions making up the specific space need to be shown on plans.It is the project designer’s/property owner’s responsibility to show compliance on the drawings with all applicable Federal and State Accessibility Standards. Show on plan an accessible primary entrance serving the specific area of remodel.Which is building 2. Site accessibility:Entrance(s) to the building or facility and primary path of travel to the specific area of new work, alteration, structural repair or addition shall be accessible. Path of travel incorporated all elements from the exterior arrival site to remodeled area.CBC Section 1127B.1. When more than one building or facility is located on a site, accessible routes of travel shall be provided between buildings and accessible site facilities.Walks and sidewalks shall have a continuous common surface, not interrupted by steps or abrupt changes in level. Surfaces shall be slip resistant.Walks and sidewalks shall not have cross slopes exceeding ¼” per foot (2% slope). Slopes along the path of travel shall not exceed 5% unless designed as a pedestrian ramp in accordance with CBC Section1133B.5. Abrupt changes in level, except between a walk or sidewalk and an adjacent street or driveway, exceeding 4” in a vertical dimension, such as at planters or fountains located in or adjacent to walks, sidewalks or other pedestrian ways, shall be identified by curbs projecting at least 6” in height above the walk or sidewalk surface to warn the blind of potential drop-off.