Loading...
HomeMy WebLinkAbout213841_4_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10187886 PROJECT ADDRESS: 510 S Main St PLAN CHECK ENGINEER: Ahangian, KathyTEL:714 647-5812FAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): B PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 1/8/2016 INITIAL REVIEW 1/26/2016 EXPIRATION 7/6/2016 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Christian Aqueveque 3. TEL: (949)355-4053 FAX: VALUATION:$45,000.00 EMAIL: hielo68@yahoo.com FLOOD ZONE:X-0602320276J APPLICABLE CODE: 2013 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5812 for an appointment.Please return marked up set of drawings with corrections.CBC Sections A106.1 and A106.3.4.1, All drawings and supporting documents shall be prepared, stamped and signed by a California licensed architect or registered civil engineer.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Fire Department approval on the corrected/final sets of drawings ((714)573-6100) - Public Works Agency approval (647-5039) - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceSubmit a signed copy of the contract showing labor and materials for all work to be done under the subject building permit application. The plan check engineer may accept the contract price as the valuation of improvements for unique/unusual projects in lieu of using a cost per square foot basis.Drawings must be to scale and be on 18” x 24” minimum sheets. - Provide a Vicinity Map showing project locationShow all the streets.Show public side walk and path of travel from public sidewalk to the building.Provide the following: - Provide a fully dimensioned site plan on each set of plans. - Disabled access compliance must be shown on the site plan. - Show all property lines of record on the site plan. Show compliance with CBC Section 704 and CBC Tables 601, 602, and 704.8.CBC Sections 1002 and 1024, EXIT DISCHARGE. That portion of a means of egress system between the termination of an exit and a public way.Show all the entrance doors of the building with in regards to the new ramp and stairways.Show out line of the building. CBC Section 1024.6, Access to a public way. The exit discharge shall provide a direct and unobstructed access to a public way.CBC Sections 1133B.2.4 and 1133B.2.4.1, Regardless of the occupant load, there shall be a floor or landing on each side of a door. The floor or landing shall be not more than ½” lower than the threshold of the doorway. Change in level between ¼” and ½” shall be beveled with a slope no greater than 1:2. Change in level greater than ½” shall be accomplished by means of a ramp. Provide detailed sections and plan views showing compliance at all doorways requiring accessibility.Stairways shall show compliance with CBC Sections 1009 and 1133B.4 including applicable disabled accessibility requirements. - Dimension rise of steps shall be not less than 4” or greater than 7”. The run shall not be less than 11”. - Treads, nosing, and risers require compliance with CBC Section 1133B.4.5, including no open risers and slip resistant treads.Provide Stairway landing (top and bottom) per CBC 1009.8.CBC Section 1133B.4.4, Where stairways occur outside a building, the upper approach and all treads shall be marked by a strip of clearly contrasting color at least 2” wide and placed parallel to and not more than 1” from the nose of the step or landing to alert the visually impaired. The strip shall be of a material that is at least as slip-resistant as the other treads of the stair. A painted strip shall be acceptable.Provide handrail details on the drawings showing compliance with CBC Section 1009.10, 1012, and 1133B.4.1. - Stairways shall have handrails on each side. - Handrails shall be 34 to 38” above the nosing of treads. - Handrails shall extend a minimum of 12” beyond the top nosing, and shall extend a minimum of 12” plus the tread width beyond the bottom nosing. - The handgrip potion of handrails shall not be less than 1¼” nor more than 1½” cross-sectional dimension or the shape shall provide an equivalent gripping surface. The handgrip portion of handrails shall have a smooth surface with no sharp corners. Any wall or other surface adjacent to the handrail shall be free of sharp or abrasive elements. Edges shall have a minimum radius of 1/8”.CBC Section 1012.1, Where required. Handrails for stairways and ramps shall be adequate in strength and attachment in accordance with CBC Section 1607.7. Handrails required for stairways by Section 1009.10 shall comply with CBC Sections 1012.2 through 1012.8. Handrails required for ramps by CBC Section 1010.8 shall comply with CBC Sections 1012.2 through 1012.7. ( Show the posts spacing)Any accessible route of travel shall be considered a ramp if its slope is greater than 1’ rise in 20’ of horizontal run (5-percent gradient) and show compliance with CBC Sections 1010 and 1133B.5.1. - Pedestrian ramps used as exits shall show compliance with CBC Sections 1010 and 1133B.5. - CBC Sections 1010.3 and 1133B.5.3.1. The slope measured perpendicular to the direction of travel of a ramp shall not be steeper than one unit vertical in 48 units horizontal (2-percent slope).CBC Section 1133B.5.4.2, Size of top and bottom landings. Top landings shall be not less than 60” wide and shall have a length of not less than 60” in the direction of ramp run. Landings at the bottom of ramps shall have a dimension in the direction of ramp run of not less than 72”.CBC Section 1133B.5.5.1, Handrails for ramps: - Shall be placed on each side of each ramp, shall be continuous the full length of the ramp - Shall be 34 to 38” above the ramp surface to the top of the handrails - Shall extend a minimum of 1’ beyond the top and bottom of the ramp and shall be parallel with the floor or ground surface - The grip portion shall not be less than 1¼” nor more than 1½“ in cross-sectional nominal dimension or the shape shall provide an equivalent gripping surface - All surfaces shall be smooth with no sharp cornersA guide curb a minimum of 2” in height shall be provided at each side of the ramp; orA wheel guide rail shall be provided, centered 3” plus or minus 1” above the surface of the ramp.CBC Section 1114B.1.2, 1114B.1.3. and 1129B.3, Item 3. Entrance(s) to the building or facility and primary path of travel to the specific area of new work, alteration, structural repair or addition shall be accessible. Path of travel incorporated all elements from the exterior arrival site to remodeled area.Walks and sidewalks shall have a continuous common surface, not interrupted by steps or abrupt changes in level. Surfaces shall be slip resistant. Refer to CBC Sections1124B and 1133B.7 for additional requirements including maximum slopes (cross slopes and along the path of travel) allowed, grading and level areas.If a walk crosses or adjoins a vehicular way, and the walking surfaces are not separated by curbs, railings or other elements between the pedestrian areas and vehicular areas, the boundary between the areas shall be defined by a continuous detectable warning which is 36” wide, complying with the CBC Section 1133B.8.5. Detectable Warning Product Approval. Only approved Division of the State Architect, Access Compliance (DSA/AC) approved detectable warning products and directional surfaces shall be installed in accordance with CBC Section 1133B.8.5.Provide SHGC and U-factor for all the new windows per Energy standard 2013 .