HomeMy WebLinkAbout218399_2_Corrections.docxRESIDENTIAL PLAN CHECK
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
10189345
PROJECT ADDRESS:
1629 W Twenty-Second St
PLAN CHECK ENGINEER:
Mazarji, ZacTEL:714
647-5831FAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
R-3
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
5/26/2016
INITIAL REVIEW
7/19/2016
EXPIRATION
11/22/2016
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Benito Corona
3.
TEL:
(714)371-7176
FAX:
VALUATION: $20,000.00
EMAIL:
archdesigner@sbcglobal.net
FLOOD ZONE: X-0602320144J
Residential Code (CRC); 2013 California Building Code (CBC); CMC = 2013 California Mechanical Code; CPC = 2013 California Plumbing Code; CEC = 2013 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Resubmit 3 corrected sets of plans.(When meeting is needed) Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5831 for an appointment.
Please see corrections on submitted plans. Red marked set must be returned with revised plans.
This review does not include mechanical, plumbing or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, and electrical work. Call 647-5800 for information.
The applicant shall obtain clearances/approvals for the following, prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (714-647-5804). Previously
approved plans should be submitted to expedite the process.
- Proof of Worker's Compensation Insurance shall be required at the time of permit issuance.The slope of addition is required to meet minimum slope of 3:12 per Table 1507.8 for proposed Shingle roof. For Tile roof with acceptable slope of less than 3:12 refer to Table 1507.3.7 of 2013 CBC. Please clarify if Composite Shingle (ESR # 1475) can meet the Tile specifications. Show location of heating equipment on the plans. (CRC R303.8). When applicable, for an FAU located in the attic provide a minimum access of 22 x 30 inches, a 24-inch wide walkway, a 30-inch deep work platform, and electric light outlet adjacent to the furnace and switched by the opening. (CMC 904.11 & 305)Interior spaces intended for human occupancy shall be provided with heating facilities capable of maintaining a room temperature of 68 degrees Fahrenheit at a point 3 feet above the floor and 2 feet from exterior walls in all habitable rooms. (CRC R303.8)Indicate that a landing, with a width not less than the width of door and length in the direction of travel of not less than 36 inches, will be provided on each side of doors. The elevation of landing shall not exceed 1 ½ inch difference than the threshold of the doorway (7 3/4 inch if door does not swing over the landing or steps) in each direction. (CRC R311.3.1) Fireblocking is required in concealed spaces 10’ o.c. horizontal, vertically at the ceiling and floor levels, connections between horizontal and vertical spaces, concealed spaces between stair and landing, openings around vents, pipes, ducts, cables, wires, chimneys and fireplaces. (CRC R302.11)The residence shall conform to the 2013 State Energy Conservation Standards. Submit forms and calculations for review and blueprint the final forms on the plans.- Signed Energy Efficiency Documents must be printed on the plans.
- The corrected/final drawings shall have the required energy efficiency compliance documentation
with completed signature blocks filed on the plans.
- The energy plan check consultant must sign documentation forms on behalf of the Building
Safety Division.
When T-24 energy calculation shows R-15 wall construction. Provide a wall construction detail (Applies to architectural and structural) to show Correct sixe of 2x studs to meet R15 wall insulation.
Please refer top attached SB407 and provide a copy on the drawings.