Loading...
HomeMy WebLinkAbout217142_2_Corrections.docxSPC PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10188994 PROJECT ADDRESS: 4501 3/4 W MacArthur Blvd Unit# WCC01 PLAN CHECK ENGINEER: Chehade, NabilTEL:714 647-5848FAX:714 647-5897 TYPE OF CONSTRUCTION: N/A OCCUPANCY CLASSIFICATION(S): U PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 4/20/2016 INITIAL REVIEW 5/11/2016 EXPIRATION 10/17/2016 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Amalia Villamil 3. TEL: (714)443-8610 FAX: VALUATION:$0.01 EMAIL: avillamil@core.us.com FLOOD ZONE:X-0602320258J APPLICABLE CODE: 2010 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5848 for an appointment.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5848 for an appointment.Provide structural calcs for the wall enclosure per the comments under file number 10199993. Clarify if the posts are prefabricated or poured in place.Are the inserts made out of vinyl or concrete?