Loading...
HomeMy WebLinkAbout221432_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10190300 PROJECT ADDRESS: 3904 3/4 W First St Unit# WCC01 PLAN CHECK ENGINEER: Mazarji, ZacTEL:714 647-5831FAX:714 647-5897 TYPE OF CONSTRUCTION: N/A OCCUPANCY CLASSIFICATION(S): N/A PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 8/8/2016 INITIAL REVIEW 8/19/2016 EXPIRATION 2/4/2017 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Virginia Becker 3. TEL: (949)930-7458 FAX: VALUATION:$20,000.00 EMAIL: virginia.becker@crowncastle.com FLOOD ZONE:X-0602320256J APPLICABLE CODE: 2013 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTSResubmit 3corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5831 for an appointment.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceDrawings to be signed and stamped by Mr. David Hawkins (Registered Professional engineer) who has signed and stamped the structural calculations. The report for verification of existing foundation by FDH Velocitel office to be signed and stamped by a California Civil/structural engineer.