HomeMy WebLinkAbout222146_1_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
10190501
PROJECT ADDRESS:
600 W Santa Ana Blvd Unit# 1100
PLAN CHECK ENGINEER:
Heidari, FredTEL:714
647-5862FAX:714
647-5897
TYPE OF CONSTRUCTION:
I A, SPK
OCCUPANCY CLASSIFICATION(S):
B
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
8/18/2016
INITIAL REVIEW
9/7/2016
EXPIRATION
2/14/2017
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
David Tsai
3.
TEL:
(310)487-1190
FAX:
VALUATION:$199,927.00
EMAIL:
Vitconstructionco@gmail.com
FLOOD ZONE:X-0602320276J
APPLICABLE CODE: 2013 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.All persons preparing plans, specifications, and instruments of service for others shall sign those plans, specifications and other instruments of service for others shall sign those plans, specifications and other instruments of service and all contracts therefore. This requirement applies to both exempt and non-exempt projects. Business and Professions Code Chapter 3, Division 3, Section 5536.1(a).This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Police Department approval on the corrected/final set of drawings (647-5840)
- Public Works Agency approval (647-5039)
- Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceSubmit a signed copy of the contract showing labor and materials for all work to be done under the subject building permit application. The plan check engineer may accept the contract price as the valuation of improvements for unique/unusual projects in lieu of using a cost per square foot basis.The valuation of improvements for the subject building permit application has been calculated to be $199,927.00.A separate Building Permit Application is required for:
- Each suite. Please coordinate with Planning Division for this item.Provide typical section view detail of all new partitions and ceilings showing:
- Method of attaching framing to the building structure. Compliance shall be shown with CBC chapter16for lateral support of the walls. Provided details on sheet A-3.0 is missing bolt sizes and its embedment. Provide on the drawings a complete door schedule, showing:
- Door sizes
- Hardware complying with exiting and disabled accessibility requirements Drawings submitted to the Building Division for review shall provide the following information to insure compliance with CBC Chapter 11B:
- Accessible restroomsSanitary facilities serving the area of new work shall be disabled accessible. Revise the drawings to show compliance with CBC Section11B-604.Provide completely dimensioned floor plans, elevations and sections of sanitary facility insuring wheelchair clearances complying with CBC chapter 11B Section 11B-604 and the California Plumbing Code.Glass and glazing shall be in accordance with CBC Chapter 24. Note on the drawings all windows and doors having glazing. Indicate the type and thickness of each light of glazing on the drawings.