Loading...
HomeMy WebLinkAbout223286_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10190894 PROJECT ADDRESS: 1551 N Tustin Ave Unit# 500 PLAN CHECK ENGINEER: Chehade, NabilTEL:714 647-5848FAX:714 647-5897 TYPE OF CONSTRUCTION: II A, SPK OCCUPANCY CLASSIFICATION(S): B PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 9/26/2016 INITIAL REVIEW 10/17/2016 EXPIRATION 3/25/2017 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Mark Yam 3. TEL: (626)675-9882 FAX: VALUATION:$169,483.90 EMAIL: meiyeeyam@sbcglobal.net FLOOD ZONE:X-0602320164J APPLICABLE CODE: 2010 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3 corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5848 for an appointment.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Public Works Agency approval (647-5039)This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information. Provide dimension of the corridor and he door encroachment into the corridor. Please note doors cannot block the required width by more than 50%. List the sprinkler submittal as a deferred submittal item. And add a note to plans indicating that a sprinkler plan will be submitted to OCF for approval. The dimension shown on the accessibility sheet appears to differ from those shown on the reference sheet for accessible toilets, Are these toilets fully accessible? Or partially accessible?