Loading...
HomeMy WebLinkAbout223367_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10190919 PROJECT ADDRESS: 2921 W MacArthur Blvd Unit# 141 PLAN CHECK ENGINEER: So, AnsonTEL:714 647-5830FAX:714 647-5897 TYPE OF CONSTRUCTION: V B, SPK OCCUPANCY CLASSIFICATION(S): B, F-2, S-2 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 9/28/2016 INITIAL REVIEW 10/27/2016 EXPIRATION 3/27/2017 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Emile Abbas 3. TEL: (714)797-3161 FAX: VALUATION:$17,200.00 EMAIL: emileabbas@gmail.com FLOOD ZONE:X-0602320258J APPLICABLE CODE: 2013 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5830 for an appointment.Please return marked up set of drawings with corrections.Sheet A-3: Specify door width at door between the gowning room and Drug-compounding room.Sheet A-3: if the door between the Gowning room and Drug-compounding room has a latch and closing, 12 inches clearance is required at the strike-edge side of the door on the push-side.Sheet A-4: Section A on elevation drawing #2 shows a 47 inches wide window. Provide a structural header detail above window opening.Sheet A-4: Section B on elevation drawing #1 shows new ceiling framing and new wall framing. Provide the following structural details: Structural connection detail between new ceiling joists to existing wall.Structural connection detail between new ceiling joists to new partition wall.Structural connection detail between new partition-wall to foundation.