HomeMy WebLinkAbout221432_2_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
10190300
PROJECT ADDRESS:
3904 3/4 W First St Unit# WCC01
PLAN CHECK ENGINEER:
Mazarji, ZacTEL:714
647-5831FAX:714
647-5897
TYPE OF CONSTRUCTION:
N/A
OCCUPANCY CLASSIFICATION(S):
N/A
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
8/8/2016
INITIAL REVIEW
8/19/2016
EXPIRATION
2/4/2017
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Virginia Becker
3.
TEL:
(949)930-7458
FAX:
VALUATION:$20,000.00
EMAIL:
virginia.becker@crowncastle.com
FLOOD ZONE:X-0602320256J
APPLICABLE CODE: 2013 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTSResubmit 3corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5831 for an appointment.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceDrawings to be signed and stamped by Mr. David Hawkins (Registered Professional engineer) who has signed and stamped the structural calculations. The report for verification of existing foundation by FDH Velocitel office to be signed and stamped by a California Civil/structural engineer.