HomeMy WebLinkAbout217917_2_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
10189231
PROJECT ADDRESS:
801 W Civic Center Dr Unit# 100
PLAN CHECK ENGINEER:
Ahangian, KathyTEL:714
647-5812FAX:714
647-5897
TYPE OF CONSTRUCTION:
III A, SPK
OCCUPANCY CLASSIFICATION(S):
B
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
5/11/2016
INITIAL REVIEW
5/30/2016
EXPIRATION
11/7/2016
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Cyrus Sany
3.
TEL:
(612)770-8181
FAX:
VALUATION:$400,000.00
EMAIL:
FLOOD ZONE:X-0602320144J
APPLICABLE CODE: 2013 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5812 for an appointment.Please return marked up set of drawings with corrections.All persons preparing plans, specifications, and instruments of service for others shall sign those plans, specifications and other instruments of service for others shall sign those plans, specifications and other instruments of service and all contracts therefore. This requirement applies to both exempt and non-exempt projects. Business and Professions Code Chapter 3, Division 3, Section 5536.1(a).Include address and telephone number of the responsible designer, and date of signing of drawings.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Fire Department approval on the corrected/final sets of drawings ((714)573-6100)
- Police Department approval on the corrected/final set of drawings (647-5840)
- Public Works Agency approval (647-5039)
- Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceProvide the following:
- Provide a fully dimensioned site plan on each set of plans.Show all the entrances and exit doors on the site plan.Reference each fire-resistive assembly to a CBC Chapter 7, Table and Item number:
- Fire resistive doorCBC Sections 1002 and 1024, EXIT DISCHARGE. That portion of a means of egress system between the termination of an exit and a public way.Provide on the drawings a complete door schedule, showing:
- Fire-rating of door assembly complying with CBC Section 715 Opening Protection
- Note smoke seal (in accordance with CBC Section 715.4.3, required for doors forming part of the one-hour
exit corridor envelope)
- Show compliance with the City of Santa Ana’s Security Ordinance (Contact the Santa Ana Police Department
Crime Prevention Section by telephoning 714-647-5840)CBC Section 1008.1, Exit doors shall be marked so that they are readily distinguishable from the adjacent construction.Exit illumination and exit sign requirements in accordance with CBC Section 1011 shall be shown on the drawings. Be specific as to the type of exit signs to be installed.Show location of card reader right at the door being altered. Please see red marks. For Type IIIA building , provide ICC approved fire proofing , if there is any alteration to Fire rating of the building due to making holes in the walls.Provide requirement per CBC 1008.1.9.8 for electronic access egress door.