Loading...
HomeMy WebLinkAbout226259_1_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10191798 PROJECT ADDRESS: 5415 W Silver Dr PLAN CHECK ENGINEER: So, AnsonTEL:714 647-5830FAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): R-3, U PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 12/29/2016 INITIAL REVIEW 2/13/2017 EXPIRATION 6/27/2017 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Bao Pham 3. TEL: (909)538-7067 FAX: VALUATION: $212,193.80 EMAIL: bao@bdpeng.com FLOOD ZONE: A-0602320252J Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2016 California Residential Code (CRC); 2016 California Building Code (CBC); CMC = 2016 California Mechanical Code; CPC = 2016 California Plumbing Code; CEC = 2016 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5830 for an appointment.The drawings/information submitted for Building Safety Division review is incomplete. The applicant shall, prior to resubmitting, complete all construction documents to show compliance with the 2016 California Building Standards Code with local amendments and to clearly indicate the scope of work under this building permit application. There may be additional requirements when complete construction drawings and supporting data is submitted for Building Safety Division review. Please see corrections on submitted plans. Red marked set must be returned with revised plans. Plans resubmitted without the red markup set may result in delayed review time and additional plancheck fees. All drawings and supporting documents shall be prepared, stamped, and signed by a California licensed architect or registered professional engineer. (CRC R301.1.3, CBC 107.1 and 107.3.4.1).All persons preparing plans for others shall sign those plans. Business and Professions Code Chapter 3, Division 3, Section 5536.1 (a). This review does not include mechanical, plumbing or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, and electrical work. Call 647-5800 for information. The applicant shall obtain clearances/approvals for the following, prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. - Public Works Agency approval (647-5039). - Proof of Worker's Compensation Insurance shall be required at the time of permit issuance. - School District Compliance Certificate; and a copy of the building permit application, signed by the plan check engineer, shall be required by the School District to verify the scope of the work. In addition to other fees, a "Park Acquisition and Development Fee" in the amount shown below shall be required pursuant to a resolution of the City Council for the Recreation and Community Services Agency; net addition of ________ bedroom(s).Amount of $6,622.22; net addition of 5 bedroomsAmount of $5,952.18; net addition of 4 bedroomsAmount of $5,375.50; net addition of 3 bedroomsAmount of $4,006.57; net addition of 2 bedroomsAmount of $3,006.99; net addition of 1 bedroom New one- and two-family dwellings and townhouses shall have an automatic fire sprinkler system installed in accordance with CRC Section R313.3 or NFPA 13D. Contact the Santa Ana Fire Department for fire sprinkler permit requirements (714) 647-5839. (CRC R313) This project is in a special flood hazard area designated on the flood insurance rate map (FIRM) as zone A or AE. This zone requires that the lowest finish floor elevation (including basement) of the structure shall be at (or above) base flood elevation determined by a hydrology study for the A zone, or at (or above) the base flood elevation specified for the AE zone, on the flood insurance rate map. All elevations must be referenced to the National Geodetic Vertical Datum. Reference should be made to the Flood Plain Management Ordinance, Santa Ana Municipal Code, Chapter 7, for complete requirements. Drawings shall show compliance with said ordinance including noting flood zone and finish floor elevation." Note on plans: "A Federal Emergency Management Agency National Flood Insurance Program ELEVATION CERTIFICATE shall be completed by a California Licensed Land Surveyor or California Registered Civil Engineer who is authorized to practice land surveying. The completed ELEVATION CERTIFICATE must be submitted to the Building Inspector at the time of foundation inspection, and a final certificate must be submitted at the time of final inspection." Walls and concrete foundation stem walls of attached garages are required to comply with FEMA requirements and shall be at (or above) the base flood elevation. Specify finish floor elevation of first floor. (CBC 107.2.5) State Division of Occupational Safety Permit (Cal/OSHA) (939-0145). -Construction of trenches or excavations, which are five feet or deeper and into which a person is required to descend. -The construction or demolition of any building, structure, false-work, or scaffolding more than three stories high or the equivalent height. Provide pedestrian protection in accordance with CBC Section 3306. Show location and type of protection on plan view. Provide typical construction details, sections, and elevations of pedestrian protection required. Pedestrian protection constructed within a public right of way shall require a building permit issued by the Building Safety Division and a separate approval from the City's Public Works Agency (647-5039). The project owner/developer shall designate a contact person who has the authority to act on behalf of the owner to coordinate and provide consistency for all of the plans required for the project including landscaping, grading, pedestrian protection, architecture, structural, electrical, mechanical and plumbing. On the drawings note the contact person's name, position, address and telephone number. (CBC 107.1 and 107.3.4.1)Prior to the issuance of building permit(s), tract maps, parcel maps, lot line adjustments, public way abandonments, covenant, conditions and restrictions (CC&R's), etc., related to the subject project must be legally recorded with the County of Orange.Sheet CS-1Provide details for proposed patio structure at existing dwelling.Revise the Occupancy group to “R-3”.Sprinkler is required to new dwelling unit. Revise project data as necessary.Sheet A-1Revise all cross sectional number to sheet “A4”.Provide 0.5 inches drywall at garage side of the wall.Show North arrow direction of floor plan.By definition, a patio must have a longer side open to at least 65% of the area below 6 foot 8 inches. The propose patio open side is the shorter side compare to its length.Show exterior landing and dimensions.Sheet A-5Provide roof ventilation on garage area.Sheet S-2Provide interior shear transfer detail at wall between the garage and patio.Specify detail “7/SD2” on the garage side of the beam near the shear wall.