Loading...
HomeMy WebLinkAbout220637_3_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10190037 PROJECT ADDRESS: 1951 E Dyer Rd Bldg# A PLAN CHECK ENGINEER: So, Anson/Nabil ChehadeTEL:714 647-5830FAX:714 647-5897 TYPE OF CONSTRUCTION: III A, SPK OCCUPANCY CLASSIFICATION(S): R-2 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 8/22/2016 INITIAL REVIEW 9/1/2016 EXPIRATION 2/18/2017 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Keith Minnie 3. TEL: (714)221-8334 FAX: VALUATION: $52,800,000.00 EMAIL: keithm@architectsorange.com FLOOD ZONE: X-0602320278J Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2013 California Residential Code (CRC); 2013 California Building Code (CBC); CMC = 2013 California Mechanical Code; CPC = 2013 California Plumbing Code; CEC = 2013 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3 corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5830 for an appointment. The applicant shall obtain clearances/approvals for the following, prior to building permit issuance: -Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. - Fire Department approval on the corrected/final set of drawings (647-5839 or 647-5700). - Police Department approval on the corrected/final set of drawings (647-5840). -Public Works Agency approval (647-5039). -Proof of Worker's Compensation Insurance shall be required at the time of permit issuance. - School District Compliance Certificate; and a copy of the building permit application, signed by the plan check engineer, shall be required by the School District to verify the scope of the work. In addition to other fees, a "Park Acquisition and Development Fee" in the amount shownbelow shall be required pursuant to a resolution of the City Council for the Recreation andCommunity Services Agency; net addition of ________ bedroom(s).Amount of $6,622.22; net addition of 5 bedroomsAmount of $5,952.18; net addition of 4 bedroomsAmount of $5,375.50; net addition of 3 bedroomsAmount of $4,006.57; net addition of 2 bedroomsAmount of $3,006.99; net addition of 1 bedroom PLAN CHECK COMMENTS:STRUCTURAL COMMENTS Are there any rebar in the slab other than the PT? Show on foundation plans (Re-bar other than the Post tension re-bars need to be clearly shown on the slab plans to make it easier for both the inspector and contractor. Currently there are many notes that need to be deciphered before installing the re-bars). On roof framing plan, show the design load for all Girder trusses. Show all chords and drag trusses and the respective design loads.(This information is provided by the building designer and not the truss designer) Specify an ENR/ICC number for the anchors to be used. Provide framing details for the store front at the fitness center, show how it is attached to the floor diaphragm. (list as differed submittal) Why are, the structural sheets, not placed in a chronological order? You almost have to look randomly to find a sheet.( It might have been misplaced when inserting sheets in the set)