HomeMy WebLinkAbout226665_1_Corrections.docxRESIDENTIAL PLAN CHECK
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
10191908
PROJECT ADDRESS:
2406 W California St
PLAN CHECK ENGINEER:
Mazarji, ZacTEL:714
647-5831FAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
R-3, U
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
1/19/2017
INITIAL REVIEW
1/25/2017
EXPIRATION
7/18/2017
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Andrew Tran
3.
TEL:
(714)309-8132
FAX:
VALUATION: $45,000.00
EMAIL:
platimum1andy@yahoo.com
FLOOD ZONE: X-0602320257J
Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2016 California Residential Code (CRC); 2016 California Building Code (CBC); CMC = 2016 California Mechanical Code; CPC = 2016 California Plumbing Code; CEC = 2016 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Please refer to red marks on the drawings for both architectural and structural drawings as additional plan check comments and revise drawings to show compliance. Red mark drawings are at permit counter and ready to be picked-up. Resubmit 3corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5831 for an appointment.
Please see corrections on submitted plans. Red marked set must be returned with revised plans. Plans resubmitted without the red markup set may result in delayed review time and additional plancheck fees.
The applicant shall obtain clearances/approvals for the following, prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804). Previously
approved plans should be submitted to expedite the process.
Proof of Worker's Compensation Insurance shall be required at the time of permit issuance.Specify ICC approval number and weight per square foot for tile and special roof coverings per roofing material specified/deigned in structural calculations. (CRC R905.3.4 and R905.3.5) Provide cross ventilation for attic and each enclosed rafter space as specified in CRC Section R806. Show location of attic access on architectural and roof framing plan, for each enclosed attic space with a maximum vertical height greater than 30 inches, provide a minimum of 22 x 30 inches attic access. (CRC R807.1) Callout attic vent locations, sizes and types on plans. Provide attic ventilation calculation to show minimum ventilation is provided. (CRC R806.2)The total net free ventilating area shall not be less than 1/150 or 1/300 when a Class I or II vapor barrier is installed on the warm-in-winter side of the ceiling. (CRC R806.2) The total net free ventilating area shall not be less than 1/300 when at least 50% and not more than 80% of the required ventilating area is provided by ventilators located in the upper portion of the space to be ventilated at least 3 feet above the eave or cornice vents with the balance of the required ventilation provided by eave or cornice vents. Show high/low vent locations on plans. (CRC R806.2)Fireblockingis required in concealed spaces 10’ o.c. horizontal, vertically at the ceiling and floor levels, connections between horizontal and vertical spaces, concealed spaces between stair and landing, openings around vents, pipes, ducts, cables, wires, chimneys and fireplaces. (CRC R302.11)
Provide detail the shear transfer connections (See red mark drawings) which transfer lateral forces from horizontal diaphragms through intermediate elements and shear walls to the foundation. Detail how the interior shear walls are connected to the roof/floor diaphragm(s).
The residence shall conform to the State Energy Conservation Standards. Submit forms and calculations for review and blueprint the final forms on the plans.
Submit enlarged and legible T-24 Sheets on the drawings and specify location of new roof insulation on the drawings and clarify if radiant barrier is specified for this project.
- Also, submit 2 copies of signed Energy Efficiency calculations.Please refer to attached CalGreen handouts and provide a completed FORMS on the drawings Please refer to attached SB 407 and provide a copy of completed Form by applicant on the drawings.Submit calculations for all existing house and garage HDR due to additional roof load and callout the size of existing or new of all HDRs on the drawings. Please refer to red marks on the drawings for additional plan check comments.