Loading...
HomeMy WebLinkAbout225454_2_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10191543 PROJECT ADDRESS: 2800 N Main St Unit# 668 PLAN CHECK ENGINEER: Heidari, FredTEL:714 647-5862FAX:714 647-5897 TYPE OF CONSTRUCTION: II B, SPK OCCUPANCY CLASSIFICATION(S): M PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 12/6/2016 INITIAL REVIEW 12/12/2016 EXPIRATION 6/4/2017 RECHECKS: 1. 02/07/2017 PROJECT APPLICANT CONTACT PERSON: 2. Yenny Ng 3. TEL: (714)426-2950 FAX: VALUATION:$37,013.00 EMAIL: yenny@yennyngdesigns.com FLOOD ZONE:X-0602320163J The recheck of your project was completed this morning, 02/07/2017; and the following items from the first plan check are not completed/ done at this time. See the list below for item # 6, 8, & 10 APPLICABLE CODE: 2013 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5862 for an appointment.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Public Works Agency approval (647-5039) - County of Orange Health Department approval on the corrected/final set of drawings ((714)433-6000) - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceShow on the plans: - Occupancy Classification. On sheet A0.1, under the project data, please modify the occupancy group and type of construction as it is marked on the plans.Provide typical section view detail of all new partitions and ceilings showing: - Size, spacing, and material of framing members. Please omit the details that do not apply to this project. For example; details 4 & 5/A2.2, 4/A5.1 and 102/S2.1 are not consistent. The designer shall provide consistency among these details. - Note gauge and ICC Research Report number and installation/construction requirements for metal framing members. - Method of attaching framing to the building structure. Compliance shall be shown with CBC chapter 16 for lateral support of the walls. Do not support top of walls to suspended ceiling system unless calculations and drawing prepared by a registered engineer are submitted for review. Submit structural engineering calculations for walls in rooms with a floor to building structure above height greater than 14’.Details 4&5/A2.2 do not show proper connection/ bracing on top of the wall and detail 4/A5.1 is missing proper bracing information. - Heights of partition, suspended ceiling, structure above. - Seems like the ceiling height for the support area is 18’ A.F.F. per plans and details, the partition wall is limited to 12’-11” on details 4 & 5 /A2.2. Please update these details to reflect actual field conditions.Provide a complete suspended ceiling system plan and section detail showing the following: - Vertical supports - Seismic wires - Seismic strut/Compression strut - Separate fixture wires for lights and mechanical devices - ICC Research Report number for the suspended ceilingProvide structural calculation and construction details for the following items:New sign over the entry door.Provide calculation and justify connection details for this sign. Or make a note on the plan to be a defer submittal.Stock shelves in the support area.Support for Menu Board,Support for Copper Hood.