PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
10187953
PROJECT ADDRESS:
660 S Santa Fe St
PLAN CHECK ENGINEER:
Chehade, NabilTEL:714
647-5848FAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
F-1
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
1/14/2016
INITIAL REVIEW
3/3/2016
EXPIRATION
7/12/2016
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Nathan Rainey
3.
TEL:
(714)864-4310
FAX:
(714)648-0291
VALUATION:$60,000.00
EMAIL:
Nathan@precisionpowder.com
FLOOD ZONE:X-0602320276J
APPLICABLE CODE: 2010 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5848 for an appointment.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.Specify the valuation of work under this permit.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans
should be submitted to expedite the process.
- Fire Department approval on the corrected/final sets of drawings ((714) 573-6100).
- Police Department approval on the corrected/final set of drawings (647-5840).
- Public Works Agency approval (647-5039).The architectural plans that shows the connection details of the proposed equipment need to be signed by the design Engineer and not the mechanical engineer.Special inspection is required for all field welding and for the installation of all mechanical anchors per the ICC report.